Gas day Nov 26
0.028
Bcf/d scheduled
Δ Day-over-day
+0.009
vs Nov 25
7-day average
0.024
Bcf/d
30-day average
0.015
30 of 30 days posted
30-day high
0.039
Nov 23
30-day low
0.000
Oct 28
Operating capacity
0.175
Bcf/d as posted, evening cycle
Utilization
16%
headroom 84%

Scheduled quantities as posted by Tennessee Gas Pipeline (TGP) on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the Supply / Production page.

0.0000.0100.0200.0300.040Oct 28Nov 2Nov 7Nov 12Nov 17Nov 22 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 260.028+0.009
Nov 250.018-0.014
Nov 240.032-0.006
Nov 230.039+0.010
Nov 220.029+0.016
Nov 210.013+0.000
Nov 200.013-0.006
Nov 190.019+0.010
Nov 180.009-0.007
Nov 170.016+0.001
Nov 160.015+0.000
Nov 150.015+0.000
Nov 140.015+0.007
Nov 130.007-0.009
Nov 120.016+0.002
Nov 110.014-0.021
Nov 100.036+0.029
Nov 90.007+0.000
Nov 80.007+0.000
Nov 70.007-0.009
Nov 60.016+0.009
Nov 50.007+0.000
Nov 40.007-0.013
Nov 30.019+0.003
Nov 20.016+0.000
Nov 10.016+0.014
Oct 310.002+0.000
Oct 300.002+0.001
Oct 290.001+0.001
Oct 280.000—
82 more days on file for this meter, back to August 7, 2026. Full meter-level history is part of Institutional (API and downloads).
Tennessee Gas Pipeline

Tennessee Gas PipelineState only (Texas) — the meter's exact site is not geocoded; the ring marks the state, not the point.

Recent notices on Tennessee Gas Pipeline (TGP)

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Tennessee Gas Pipeline (TGP) notices →

Tennessee Gas Pipeline (TGP) · posted 2026-11-21 · effective 2026-11-16 · informational
Tennessee Gas Pipeline (TGP) · posted 2026-11-16 · effective 2026-11-16 · force majeure
TGP force majeure at Station 542 Unit 2A near De Kalb, MS remains in effect with no restoration timeline. Up to 250,000 Dth/d (0.25 Bcf/d) of Primary firm capacity pathed through Segment 539 BH is at risk of curtailment beginning Timely Cycle for gas day November 17. This Revisio…
Tennessee Gas Pipeline (TGP) · posted 2026-11-05 · effective 2026-11-06 · informational

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, T2 GAS/TGP UDP KELLEY ROAD: RIP 5R (Tennessee Gas Pipeline (TGP) loc 412869) scheduled quantity, gas day November 26, 2026. https://enercast.com/meter/tgp/412869/