Enercast — at the moment it matters
Home / Daily Summary / Supply / Production / Meter

DIV PROD/TGP MASON DEHY: RIP 315F 1

Tennessee Gas Pipeline (TGP) · Loc 412858 · Pennsylvania
Gathering receipt · counted in Supply / Production
Gas day Nov 26
0.017
Bcf/d scheduled
Δ Day-over-day
-0.005
vs Nov 25
7-day average
0.022
Bcf/d
30-day average
0.021
30 of 30 days posted
30-day high
0.023
Nov 23
30-day low
0.017
Nov 26
Operating capacity
0.216
Bcf/d as posted, evening cycle
Utilization
8%
headroom 92%

Scheduled quantities as posted by Tennessee Gas Pipeline (TGP) on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the Supply / Production page.

0.0000.0100.0200.030Oct 28Nov 2Nov 7Nov 12Nov 17Nov 22 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 260.017-0.005
Nov 250.022+0.000
Nov 240.022-0.001
Nov 230.023+0.000
Nov 220.023+0.000
Nov 210.023+0.000
Nov 200.023+0.000
Nov 190.023+0.000
Nov 180.023+0.000
Nov 170.023+0.000
Nov 160.023+0.001
Nov 150.022-0.001
Nov 140.023+0.000
Nov 130.023+0.000
Nov 120.023+0.000
Nov 110.023+0.001
Nov 100.022+0.003
Nov 90.019+0.000
Nov 80.019+0.000
Nov 70.019+0.000
Nov 60.019+0.000
Nov 50.019+0.000
Nov 40.019+0.000
Nov 30.019-0.002
Nov 20.021+0.000
Nov 10.021+0.001
Oct 310.020+0.003
Oct 300.017-0.003
Oct 290.020+0.000
Oct 280.020—
82 more days on file for this meter, back to August 7, 2026. Full meter-level history is part of Institutional (API and downloads).
Tennessee Gas Pipeline

Tennessee Gas PipelineState only (Pennsylvania) — the meter's exact site is not geocoded; the ring marks the state, not the point.

Recent notices on Tennessee Gas Pipeline (TGP)

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Tennessee Gas Pipeline (TGP) notices →

Tennessee Gas Pipeline (TGP) · posted 2026-11-21 · effective 2026-11-16 · informational
Tennessee Gas Pipeline (TGP) · posted 2026-11-16 · effective 2026-11-16 · force majeure
TGP force majeure at Station 542 Unit 2A near De Kalb, MS remains in effect with no restoration timeline. Up to 250,000 Dth/d (0.25 Bcf/d) of Primary firm capacity pathed through Segment 539 BH is at risk of curtailment beginning Timely Cycle for gas day November 17. This Revisio…
Tennessee Gas Pipeline (TGP) · posted 2026-11-05 · effective 2026-11-06 · informational

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, DIV PROD/TGP MASON DEHY: RIP 315F 1 (Tennessee Gas Pipeline (TGP) loc 412858) scheduled quantity, gas day November 26, 2026. https://enercast.com/meter/tgp/412858/