REPSOLOG/TGP SHEDDEN II DEHY: RIP 3

Tennessee Gas Pipeline (TGP) · Loc 412818 · Pennsylvania
Processing plant · counted in Supply / Production
Gas day Nov 27
0.100
Bcf/d scheduled
Δ Day-over-day
+0.000
vs Nov 26
7-day average
0.100
Bcf/d
30-day average
0.100
30 of 30 days posted
30-day high
0.100
Nov 27
30-day low
0.098
Nov 2
Operating capacity
0.373
Bcf/d as posted, evening cycle
Utilization
27%
headroom 73%

Scheduled quantities as posted by Tennessee Gas Pipeline (TGP) on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the Supply / Production page.

0.000.050.100.15Oct 29Nov 3Nov 8Nov 13Nov 18Nov 23 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 270.100+0.000
Nov 260.100+0.000
Nov 250.100+0.000
Nov 240.100-0.000
Nov 230.100+0.000
Nov 220.100+0.000
Nov 210.100+0.000
Nov 200.100+0.000
Nov 190.100+0.000
Nov 180.100+0.000
Nov 170.100+0.000
Nov 160.100+0.000
Nov 150.100+0.000
Nov 140.100+0.000
Nov 130.100+0.000
Nov 120.100+0.000
Nov 110.100+0.000
Nov 100.100+0.000
Nov 90.100+0.000
Nov 80.100+0.000
Nov 70.100+0.000
Nov 60.100-0.000
Nov 50.100+0.000
Nov 40.100+0.000
Nov 30.100+0.002
Nov 20.098-0.002
Nov 10.100+0.000
Oct 310.100+0.000
Oct 300.100+0.000
Oct 290.100—
83 more days on file for this meter, back to August 7, 2026. Full meter-level history is part of Institutional (API and downloads).
Tennessee Gas Pipeline

Tennessee Gas PipelineState only (Pennsylvania) — the meter's exact site is not geocoded; the ring marks the state, not the point.

Recent notices on Tennessee Gas Pipeline (TGP)

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Tennessee Gas Pipeline (TGP) notices →

Tennessee Gas Pipeline (TGP) · posted 2026-11-21 · effective 2026-11-16 · informational
Tennessee Gas Pipeline (TGP) · posted 2026-11-16 · effective 2026-11-16 · force majeure
TGP force majeure at Station 542 Unit 2A near De Kalb, MS remains in effect with no restoration timeline. Up to 250,000 Dth/d (0.25 Bcf/d) of Primary firm capacity pathed through Segment 539 BH is at risk of curtailment beginning Timely Cycle for gas day November 17. This Revisio…
Tennessee Gas Pipeline (TGP) · posted 2026-11-05 · effective 2026-11-06 · informational

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, REPSOLOG/TGP SHEDDEN II DEHY: RIP 3 (Tennessee Gas Pipeline (TGP) loc 412818) scheduled quantity, gas day November 27, 2026. https://enercast.com/meter/tgp/412818/