Enercast — at the moment it matters
Home / Daily Summary / Supply / Production / Meter

UGITX/TGP SWEENEY DEHY: RIP 316E 10

Tennessee Gas Pipeline (TGP) · Loc 412796 · Pennsylvania
Processing plant · counted in Supply / Production
Gas day Nov 26
0.124
Bcf/d scheduled
Δ Day-over-day
+0.000
vs Nov 25
7-day average
0.123
Bcf/d
30-day average
0.123
30 of 30 days posted
30-day high
0.126
Oct 31
30-day low
0.117
Nov 19
Operating capacity
0.126
Bcf/d as posted, evening cycle
Utilization
98%
headroom 2%

Scheduled quantities as posted by Tennessee Gas Pipeline (TGP) on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the Supply / Production page.

0.000.050.100.15Oct 28Nov 2Nov 7Nov 12Nov 17Nov 22 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 260.124+0.000
Nov 250.124+0.002
Nov 240.121-0.001
Nov 230.123+0.000
Nov 220.123+0.000
Nov 210.123-0.001
Nov 200.124+0.006
Nov 190.117-0.004
Nov 180.121+0.001
Nov 170.120-0.002
Nov 160.123+0.000
Nov 150.123+0.000
Nov 140.123-0.001
Nov 130.124+0.000
Nov 120.124+0.000
Nov 110.124+0.000
Nov 100.124+0.000
Nov 90.124+0.000
Nov 80.124+0.000
Nov 70.124+0.000
Nov 60.124+0.000
Nov 50.124+0.000
Nov 40.124+0.000
Nov 30.124+0.000
Nov 20.124+0.000
Nov 10.124-0.002
Oct 310.126+0.003
Oct 300.123-0.001
Oct 290.124+0.000
Oct 280.124—
82 more days on file for this meter, back to August 7, 2026. Full meter-level history is part of Institutional (API and downloads).
Tennessee Gas Pipeline

Tennessee Gas PipelineState only (Pennsylvania) — the meter's exact site is not geocoded; the ring marks the state, not the point.

Recent notices on Tennessee Gas Pipeline (TGP)

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Tennessee Gas Pipeline (TGP) notices →

Tennessee Gas Pipeline (TGP) · posted 2026-11-21 · effective 2026-11-16 · informational
Tennessee Gas Pipeline (TGP) · posted 2026-11-16 · effective 2026-11-16 · force majeure
TGP force majeure at Station 542 Unit 2A near De Kalb, MS remains in effect with no restoration timeline. Up to 250,000 Dth/d (0.25 Bcf/d) of Primary firm capacity pathed through Segment 539 BH is at risk of curtailment beginning Timely Cycle for gas day November 17. This Revisio…
Tennessee Gas Pipeline (TGP) · posted 2026-11-05 · effective 2026-11-06 · informational

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, UGITX/TGP SWEENEY DEHY: RIP 316E 10 (Tennessee Gas Pipeline (TGP) loc 412796) scheduled quantity, gas day November 26, 2026. https://enercast.com/meter/tgp/412796/