Enercast — at the moment it matters
Home / Daily Summary / Supply / Production / Meter

WFS/TGP UDP TEEL DEHY: RIP 320H 101

Tennessee Gas Pipeline (TGP) · Loc 412778 · Pennsylvania
Processing plant · counted in Supply / Production
Gas day Nov 26
0.045
Bcf/d scheduled
Δ Day-over-day
+0.000
vs Nov 25
7-day average
0.052
Bcf/d
30-day average
0.047
30 of 30 days posted
30-day high
0.095
Nov 24
30-day low
0.045
Nov 26
Operating capacity
0.145
Bcf/d as posted, evening cycle
Utilization
31%
headroom 69%

Scheduled quantities as posted by Tennessee Gas Pipeline (TGP) on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the Supply / Production page.

0.0000.0250.0500.0750.100Oct 28Nov 2Nov 7Nov 12Nov 17Nov 22 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 260.045+0.000
Nov 250.045-0.050
Nov 240.095+0.050
Nov 230.045+0.000
Nov 220.045+0.000
Nov 210.045+0.000
Nov 200.045+0.000
Nov 190.045+0.000
Nov 180.045+0.000
Nov 170.045+0.000
Nov 160.045+0.000
Nov 150.045+0.000
Nov 140.045+0.000
Nov 130.045+0.000
Nov 120.045+0.000
Nov 110.045+0.000
Nov 100.045+0.000
Nov 90.045+0.000
Nov 80.045+0.000
Nov 70.045+0.000
Nov 60.045+0.000
Nov 50.045+0.000
Nov 40.045+0.000
Nov 30.045+0.000
Nov 20.045+0.000
Nov 10.045+0.000
Oct 310.045+0.000
Oct 300.045+0.000
Oct 290.045+0.000
Oct 280.045—
82 more days on file for this meter, back to August 7, 2026. Full meter-level history is part of Institutional (API and downloads).
Tennessee Gas Pipeline

Tennessee Gas PipelineState only (Pennsylvania) — the meter's exact site is not geocoded; the ring marks the state, not the point.

Recent notices on Tennessee Gas Pipeline (TGP)

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Tennessee Gas Pipeline (TGP) notices →

Tennessee Gas Pipeline (TGP) · posted 2026-11-21 · effective 2026-11-16 · informational
Tennessee Gas Pipeline (TGP) · posted 2026-11-16 · effective 2026-11-16 · force majeure
TGP force majeure at Station 542 Unit 2A near De Kalb, MS remains in effect with no restoration timeline. Up to 250,000 Dth/d (0.25 Bcf/d) of Primary firm capacity pathed through Segment 539 BH is at risk of curtailment beginning Timely Cycle for gas day November 17. This Revisio…
Tennessee Gas Pipeline (TGP) · posted 2026-11-05 · effective 2026-11-06 · informational

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, WFS/TGP UDP TEEL DEHY: RIP 320H 101 (Tennessee Gas Pipeline (TGP) loc 412778) scheduled quantity, gas day November 26, 2026. https://enercast.com/meter/tgp/412778/