HPL/TGP SABINE NEWTON

Tennessee Gas Pipeline (TGP) · Loc 412690 · Texas
Intrastate interconnect · counted in Supply / Production
Gas day Nov 26
0.167
Bcf/d scheduled
Δ Day-over-day
+0.011
vs Nov 25
7-day average
0.154
Bcf/d
30-day average
0.161
30 of 30 days posted
30-day high
0.202
Nov 11
30-day low
0.080
Nov 4
Operating capacity
0.300
Bcf/d as posted, evening cycle
Utilization
56%
headroom 44%

Scheduled quantities as posted by Tennessee Gas Pipeline (TGP) on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the Supply / Production page.

0.000.100.200.30Oct 28Nov 2Nov 7Nov 12Nov 17Nov 22 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 260.167+0.011
Nov 250.156+0.017
Nov 240.140-0.005
Nov 230.145-0.015
Nov 220.160+0.000
Nov 210.160+0.005
Nov 200.155+0.000
Nov 190.154+0.004
Nov 180.151-0.038
Nov 170.189-0.008
Nov 160.197+0.020
Nov 150.177+0.000
Nov 140.177-0.008
Nov 130.185-0.002
Nov 120.187-0.015
Nov 110.202+0.023
Nov 100.179+0.021
Nov 90.158+0.005
Nov 80.153+0.000
Nov 70.153+0.017
Nov 60.137-0.021
Nov 50.158+0.077
Nov 40.080+0.000
Nov 30.080-0.101
Nov 20.181+0.001
Nov 10.181+0.041
Oct 310.140-0.007
Oct 300.147-0.048
Oct 290.195+0.016
Oct 280.179—
82 more days on file for this meter, back to August 7, 2026. Full meter-level history is part of Institutional (API and downloads).
Tennessee Gas Pipeline

Tennessee Gas PipelineState only (Texas) — the meter's exact site is not geocoded; the ring marks the state, not the point.

Recent notices on Tennessee Gas Pipeline (TGP)

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Tennessee Gas Pipeline (TGP) notices →

Tennessee Gas Pipeline (TGP) · posted 2026-11-21 · effective 2026-11-16 · informational
Tennessee Gas Pipeline (TGP) · posted 2026-11-16 · effective 2026-11-16 · force majeure
TGP force majeure at Station 542 Unit 2A near De Kalb, MS remains in effect with no restoration timeline. Up to 250,000 Dth/d (0.25 Bcf/d) of Primary firm capacity pathed through Segment 539 BH is at risk of curtailment beginning Timely Cycle for gas day November 17. This Revisio…
Tennessee Gas Pipeline (TGP) · posted 2026-11-05 · effective 2026-11-06 · informational

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, HPL/TGP SABINE NEWTON (Tennessee Gas Pipeline (TGP) loc 412690) scheduled quantity, gas day November 26, 2026. https://enercast.com/meter/tgp/412690/