Enercast — at the moment it matters
Home / Daily Summary / Supply / Production / Meter

ETP/TGP GILMORE PLANT RESIDUE HIDAL

Tennessee Gas Pipeline (TGP) · Loc 412458 · Texas
Processing plant · counted in Supply / Production
Gas day Nov 26
0.065
Bcf/d scheduled
Δ Day-over-day
+0.001
vs Nov 25
7-day average
0.068
Bcf/d
30-day average
0.065
30 of 30 days posted
30-day high
0.084
Oct 28
30-day low
0.042
Oct 31
Operating capacity
0.255
Bcf/d as posted, evening cycle
Utilization
25%
headroom 75%

Scheduled quantities as posted by Tennessee Gas Pipeline (TGP) on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the Supply / Production page.

0.0000.0250.0500.0750.100Oct 28Nov 2Nov 7Nov 12Nov 17Nov 22 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 260.065+0.001
Nov 250.064-0.010
Nov 240.074-0.000
Nov 230.074+0.010
Nov 220.064+0.000
Nov 210.064-0.004
Nov 200.069-0.006
Nov 190.074+0.008
Nov 180.067-0.003
Nov 170.070+0.010
Nov 160.060+0.003
Nov 150.057-0.004
Nov 140.061+0.001
Nov 130.060-0.010
Nov 120.071-0.007
Nov 110.077+0.002
Nov 100.075+0.017
Nov 90.058+0.011
Nov 80.047+0.000
Nov 70.047-0.013
Nov 60.060-0.020
Nov 50.080+0.013
Nov 40.067-0.008
Nov 30.075+0.005
Nov 20.070-0.002
Nov 10.072+0.031
Oct 310.042-0.001
Oct 300.043-0.022
Oct 290.065-0.019
Oct 280.084—
82 more days on file for this meter, back to August 7, 2026. Full meter-level history is part of Institutional (API and downloads).
Tennessee Gas Pipeline

Tennessee Gas PipelineState only (Texas) — the meter's exact site is not geocoded; the ring marks the state, not the point.

Recent notices on Tennessee Gas Pipeline (TGP)

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Tennessee Gas Pipeline (TGP) notices →

Tennessee Gas Pipeline (TGP) · posted 2026-11-21 · effective 2026-11-16 · informational
Tennessee Gas Pipeline (TGP) · posted 2026-11-16 · effective 2026-11-16 · force majeure
TGP force majeure at Station 542 Unit 2A near De Kalb, MS remains in effect with no restoration timeline. Up to 250,000 Dth/d (0.25 Bcf/d) of Primary firm capacity pathed through Segment 539 BH is at risk of curtailment beginning Timely Cycle for gas day November 17. This Revisio…
Tennessee Gas Pipeline (TGP) · posted 2026-11-05 · effective 2026-11-06 · informational

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, ETP/TGP GILMORE PLANT RESIDUE HIDAL (Tennessee Gas Pipeline (TGP) loc 412458) scheduled quantity, gas day November 26, 2026. https://enercast.com/meter/tgp/412458/