Enercast — at the moment it matters
Home / Daily Summary / Supply / Production / Meter

LOBO/TGP KING RANCH JIM WELLS

Tennessee Gas Pipeline (TGP) · Loc 412400 · Texas
Intrastate interconnect · counted in Supply / Production
Gas day Nov 26
0.149
Bcf/d scheduled
Δ Day-over-day
-0.011
vs Nov 25
7-day average
0.159
Bcf/d
30-day average
0.161
30 of 30 days posted
30-day high
0.179
Oct 28
30-day low
0.149
Nov 26
Operating capacity
0.230
Bcf/d as posted, evening cycle
Utilization
65%
headroom 35%

Scheduled quantities as posted by Tennessee Gas Pipeline (TGP) on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the Supply / Production page.

0.000.050.100.150.20Oct 28Nov 2Nov 7Nov 12Nov 17Nov 22 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 260.149-0.011
Nov 250.160+0.003
Nov 240.157-0.004
Nov 230.161+0.000
Nov 220.161+0.000
Nov 210.161-0.000
Nov 200.161+0.000
Nov 190.161+0.000
Nov 180.161-0.000
Nov 170.162+0.000
Nov 160.162+0.000
Nov 150.162+0.009
Nov 140.153-0.009
Nov 130.162+0.000
Nov 120.162+0.000
Nov 110.162+0.004
Nov 100.158-0.002
Nov 90.160+0.000
Nov 80.160+0.000
Nov 70.160-0.000
Nov 60.161-0.000
Nov 50.161+0.004
Nov 40.157+0.000
Nov 30.157+0.006
Nov 20.151+0.000
Nov 10.151-0.026
Oct 310.176+0.000
Oct 300.176+0.004
Oct 290.172-0.007
Oct 280.179—
82 more days on file for this meter, back to August 7, 2026. Full meter-level history is part of Institutional (API and downloads).
Tennessee Gas Pipeline

Tennessee Gas PipelineState only (Texas) — the meter's exact site is not geocoded; the ring marks the state, not the point.

Notices that name this point

Text match on the meter’s name or location ID in the notice — last 90 days. A text match is a pointer, not a confirmed capacity impact at this meter.

Tennessee Gas Pipeline (TGP) · posted 2026-11-16 · informational
Recent notices on Tennessee Gas Pipeline (TGP)

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Tennessee Gas Pipeline (TGP) notices →

Tennessee Gas Pipeline (TGP) · posted 2026-11-21 · effective 2026-11-16 · informational
Tennessee Gas Pipeline (TGP) · posted 2026-11-16 · effective 2026-11-16 · force majeure
TGP force majeure at Station 542 Unit 2A near De Kalb, MS remains in effect with no restoration timeline. Up to 250,000 Dth/d (0.25 Bcf/d) of Primary firm capacity pathed through Segment 539 BH is at risk of curtailment beginning Timely Cycle for gas day November 17. This Revisio…
Tennessee Gas Pipeline (TGP) · posted 2026-11-05 · effective 2026-11-06 · informational

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, LOBO/TGP KING RANCH JIM WELLS (Tennessee Gas Pipeline (TGP) loc 412400) scheduled quantity, gas day November 26, 2026. https://enercast.com/meter/tgp/412400/