ET G&P/TGP BROOKELAND FIELD DEHY SA

Tennessee Gas Pipeline (TGP) · Loc 412277 · Texas
Processing plant · counted in Supply / Production
Gas day Nov 26
0.017
Bcf/d scheduled
Δ Day-over-day
+0.000
vs Nov 25
7-day average
0.033
Bcf/d
30-day average
0.042
30 of 30 days posted
30-day high
0.051
Nov 3
30-day low
0.016
Nov 24
Operating capacity
0.191
Bcf/d as posted, evening cycle
Utilization
9%
headroom 91%

Scheduled quantities as posted by Tennessee Gas Pipeline (TGP) on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the Supply / Production page.

0.0000.0200.0400.060Oct 28Nov 2Nov 7Nov 12Nov 17Nov 22 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 260.017+0.000
Nov 250.017+0.000
Nov 240.016-0.029
Nov 230.045+0.000
Nov 220.045+0.000
Nov 210.045-0.001
Nov 200.046+0.000
Nov 190.046+0.018
Nov 180.028-0.015
Nov 170.043+0.001
Nov 160.043-0.001
Nov 150.044+0.000
Nov 140.044+0.000
Nov 130.043-0.002
Nov 120.046+0.000
Nov 110.046+0.000
Nov 100.045+0.000
Nov 90.045+0.000
Nov 80.045+0.000
Nov 70.045-0.005
Nov 60.051+0.000
Nov 50.051+0.000
Nov 40.051-0.000
Nov 30.051+0.000
Nov 20.051+0.000
Nov 10.051+0.003
Oct 310.048+0.000
Oct 300.048+0.023
Oct 290.025+0.000
Oct 280.025—
82 more days on file for this meter, back to August 7, 2026. Full meter-level history is part of Institutional (API and downloads).
Tennessee Gas Pipeline

Tennessee Gas PipelineState only (Texas) — the meter's exact site is not geocoded; the ring marks the state, not the point.

Recent notices on Tennessee Gas Pipeline (TGP)

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Tennessee Gas Pipeline (TGP) notices →

Tennessee Gas Pipeline (TGP) · posted 2026-11-21 · effective 2026-11-16 · informational
Tennessee Gas Pipeline (TGP) · posted 2026-11-16 · effective 2026-11-16 · force majeure
TGP force majeure at Station 542 Unit 2A near De Kalb, MS remains in effect with no restoration timeline. Up to 250,000 Dth/d (0.25 Bcf/d) of Primary firm capacity pathed through Segment 539 BH is at risk of curtailment beginning Timely Cycle for gas day November 17. This Revisio…
Tennessee Gas Pipeline (TGP) · posted 2026-11-05 · effective 2026-11-06 · informational

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, ET G&P/TGP BROOKELAND FIELD DEHY SA (Tennessee Gas Pipeline (TGP) loc 412277) scheduled quantity, gas day November 26, 2026. https://enercast.com/meter/tgp/412277/