Gas day Nov 26
0.034
Bcf/d scheduled
Δ Day-over-day
+0.033
vs Nov 25
7-day average
0.010
Bcf/d
30-day average
0.019
30 of 30 days posted
30-day high
0.070
Nov 14
30-day low
0.000
Nov 23
Operating capacity
0.105
Bcf/d as posted, evening cycle
Utilization
33%
headroom 67%

Scheduled quantities as posted by Tennessee Gas Pipeline (TGP) on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the Supply / Production page.

0.0000.0200.0400.0600.080Oct 28Nov 2Nov 7Nov 12Nov 17Nov 22 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 260.034+0.033
Nov 250.002-0.008
Nov 240.010+0.010
Nov 230.000+0.000
Nov 220.000-0.011
Nov 210.011-0.001
Nov 200.012-0.006
Nov 190.018+0.018
Nov 180.000-0.015
Nov 170.015-0.010
Nov 160.025-0.041
Nov 150.066-0.004
Nov 140.070+0.055
Nov 130.015-0.021
Nov 120.036+0.001
Nov 110.035+0.018
Nov 100.017+0.001
Nov 90.016+0.008
Nov 80.008-0.008
Nov 70.016+0.011
Nov 60.005-0.032
Nov 50.038-0.007
Nov 40.045+0.008
Nov 30.037+0.031
Nov 20.007-0.004
Nov 10.011-0.019
Oct 310.030+0.025
Oct 300.005+0.005
Oct 290.000+0.000
Oct 280.000—
82 more days on file for this meter, back to August 7, 2026. Full meter-level history is part of Institutional (API and downloads).
Tennessee Gas Pipeline

Tennessee Gas PipelineState only (Texas) — the meter's exact site is not geocoded; the ring marks the state, not the point.

Recent notices on Tennessee Gas Pipeline (TGP)

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Tennessee Gas Pipeline (TGP) notices →

Tennessee Gas Pipeline (TGP) · posted 2026-11-21 · effective 2026-11-16 · informational
Tennessee Gas Pipeline (TGP) · posted 2026-11-16 · effective 2026-11-16 · force majeure
TGP force majeure at Station 542 Unit 2A near De Kalb, MS remains in effect with no restoration timeline. Up to 250,000 Dth/d (0.25 Bcf/d) of Primary firm capacity pathed through Segment 539 BH is at risk of curtailment beginning Timely Cycle for gas day November 17. This Revisio…
Tennessee Gas Pipeline (TGP) · posted 2026-11-05 · effective 2026-11-06 · informational

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, ATMOS-TX/TGP KATY EXCH WALLER (Tennessee Gas Pipeline (TGP) loc 412100) scheduled quantity, gas day November 26, 2026. https://enercast.com/meter/tgp/412100/