Enercast — at the moment it matters
Home / Daily Summary / Supply / Production / Meter

/TGP HEIDELBURG TRANSPORT JASPER

Tennessee Gas Pipeline (TGP) · Loc 412060 · Mississippi
Gathering receipt · counted in Supply / Production
Gas day Nov 27
0.002
Bcf/d scheduled
Δ Day-over-day
+0.002
vs Nov 26
7-day average
0.001
Bcf/d
30-day average
0.001
30 of 30 days posted
30-day high
0.002
Nov 27
30-day low
0.000
Nov 23
Operating capacity
0.021
Bcf/d as posted, evening cycle
Utilization
10%
headroom 90%

Scheduled quantities as posted by Tennessee Gas Pipeline (TGP) on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the Supply / Production page.

0.0000.0010.0010.0020.002Oct 29Nov 3Nov 8Nov 13Nov 18Nov 23 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 270.002+0.002
Nov 260.000-0.002
Nov 250.002+0.000
Nov 240.002+0.002
Nov 230.000+0.000
Nov 220.000+0.000
Nov 210.000-0.002
Nov 200.002+0.000
Nov 190.002+0.002
Nov 180.000-0.000
Nov 170.001+0.000
Nov 160.000+0.000
Nov 150.000-0.001
Nov 140.002+0.000
Nov 130.002-0.000
Nov 120.002+0.000
Nov 110.002+0.000
Nov 100.002+0.000
Nov 90.002+0.000
Nov 80.002+0.000
Nov 70.002-0.000
Nov 60.002-0.000
Nov 50.002+0.000
Nov 40.002+0.000
Nov 30.002+0.000
Nov 20.002-0.000
Nov 10.002+0.000
Oct 310.001+0.000
Oct 300.001-0.000
Oct 290.002—
83 more days on file for this meter, back to August 7, 2026. Full meter-level history is part of Institutional (API and downloads).
Tennessee Gas Pipeline

Tennessee Gas PipelineState only (Mississippi) — the meter's exact site is not geocoded; the ring marks the state, not the point.

Recent notices on Tennessee Gas Pipeline (TGP)

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Tennessee Gas Pipeline (TGP) notices →

Tennessee Gas Pipeline (TGP) · posted 2026-11-21 · effective 2026-11-16 · informational
Tennessee Gas Pipeline (TGP) · posted 2026-11-16 · effective 2026-11-16 · force majeure
TGP force majeure at Station 542 Unit 2A near De Kalb, MS remains in effect with no restoration timeline. Up to 250,000 Dth/d (0.25 Bcf/d) of Primary firm capacity pathed through Segment 539 BH is at risk of curtailment beginning Timely Cycle for gas day November 17. This Revisio…
Tennessee Gas Pipeline (TGP) · posted 2026-11-05 · effective 2026-11-06 · informational

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, /TGP HEIDELBURG TRANSPORT JASPER (Tennessee Gas Pipeline (TGP) loc 412060) scheduled quantity, gas day November 27, 2026. https://enercast.com/meter/tgp/412060/