Enercast — at the moment it matters
Home / Daily Summary / Supply / Production / Meter

ETP/TGP WHARTON COUNTY TRANSPORT EX

Tennessee Gas Pipeline (TGP) · Loc 411911 · Texas
Intrastate interconnect · counted in Supply / Production
Gas day Nov 27
0.002
Bcf/d scheduled
Δ Day-over-day
+0.000
vs Nov 26
7-day average
0.007
Bcf/d
30-day average
0.046
30 of 30 days posted
30-day high
0.145
Nov 5
30-day low
0.002
Nov 25
Operating capacity
0.173
Bcf/d as posted, evening cycle
Utilization
1%
headroom 99%

Scheduled quantities as posted by Tennessee Gas Pipeline (TGP) on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the Supply / Production page.

0.000.050.100.15Oct 29Nov 3Nov 8Nov 13Nov 18Nov 23 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 270.002+0.000
Nov 260.002+0.000
Nov 250.002-0.008
Nov 240.009+0.001
Nov 230.009+0.001
Nov 220.007-0.007
Nov 210.015+0.007
Nov 200.008+0.005
Nov 190.003-0.007
Nov 180.010+0.002
Nov 170.008-0.025
Nov 160.033-0.008
Nov 150.042+0.004
Nov 140.037+0.007
Nov 130.030-0.039
Nov 120.069+0.042
Nov 110.027-0.080
Nov 100.107+0.007
Nov 90.100+0.027
Nov 80.073-0.011
Nov 70.084-0.025
Nov 60.109-0.036
Nov 50.145+0.041
Nov 40.104+0.087
Nov 30.016-0.037
Nov 20.053-0.015
Nov 10.068+0.013
Oct 310.055+0.016
Oct 300.039-0.072
Oct 290.111—
83 more days on file for this meter, back to August 7, 2026. Full meter-level history is part of Institutional (API and downloads).
Tennessee Gas Pipeline

Tennessee Gas PipelineState only (Texas) — the meter's exact site is not geocoded; the ring marks the state, not the point.

Recent notices on Tennessee Gas Pipeline (TGP)

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Tennessee Gas Pipeline (TGP) notices →

Tennessee Gas Pipeline (TGP) · posted 2026-11-21 · effective 2026-11-16 · informational
Tennessee Gas Pipeline (TGP) · posted 2026-11-16 · effective 2026-11-16 · force majeure
TGP force majeure at Station 542 Unit 2A near De Kalb, MS remains in effect with no restoration timeline. Up to 250,000 Dth/d (0.25 Bcf/d) of Primary firm capacity pathed through Segment 539 BH is at risk of curtailment beginning Timely Cycle for gas day November 17. This Revisio…
Tennessee Gas Pipeline (TGP) · posted 2026-11-05 · effective 2026-11-06 · informational

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, ETP/TGP WHARTON COUNTY TRANSPORT EX (Tennessee Gas Pipeline (TGP) loc 411911) scheduled quantity, gas day November 27, 2026. https://enercast.com/meter/tgp/411911/