Enercast — at the moment it matters
Home / Daily Summary / Supply / Production / Meter

OWS ENRG/TGP BIG SANDY DEHY CRAWFOR

Tennessee Gas Pipeline (TGP) · Loc 411577 · Pennsylvania
Processing plant · counted in Supply / Production
Gas day Nov 26
0.003
Bcf/d scheduled
Δ Day-over-day
+0.000
vs Nov 25
7-day average
0.003
Bcf/d
30-day average
0.003
30 of 30 days posted
30-day high
0.012
Nov 2
30-day low
0.000
Oct 28
Operating capacity
0.030
Bcf/d as posted, evening cycle
Utilization
8%
headroom 92%

Scheduled quantities as posted by Tennessee Gas Pipeline (TGP) on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the Supply / Production page.

0.0000.0050.0100.015Oct 28Nov 2Nov 7Nov 12Nov 17Nov 22 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 260.003+0.000
Nov 250.003+0.000
Nov 240.003+0.000
Nov 230.003+0.000
Nov 220.003+0.000
Nov 210.003+0.000
Nov 200.003+0.000
Nov 190.003-0.005
Nov 180.008+0.005
Nov 170.003+0.000
Nov 160.003+0.000
Nov 150.003+0.000
Nov 140.003+0.000
Nov 130.002-0.000
Nov 120.003+0.000
Nov 110.003+0.000
Nov 100.003+0.000
Nov 90.002+0.000
Nov 80.002+0.000
Nov 70.002+0.000
Nov 60.002+0.000
Nov 50.002+0.001
Nov 40.001-0.001
Nov 30.002-0.009
Nov 20.012+0.009
Nov 10.003+0.000
Oct 310.003+0.000
Oct 300.003+0.002
Oct 290.001+0.001
Oct 280.000—
82 more days on file for this meter, back to August 7, 2026. Full meter-level history is part of Institutional (API and downloads).
Tennessee Gas Pipeline

Tennessee Gas PipelineState only (Pennsylvania) — the meter's exact site is not geocoded; the ring marks the state, not the point.

Recent notices on Tennessee Gas Pipeline (TGP)

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Tennessee Gas Pipeline (TGP) notices →

Tennessee Gas Pipeline (TGP) · posted 2026-11-21 · effective 2026-11-16 · informational
Tennessee Gas Pipeline (TGP) · posted 2026-11-16 · effective 2026-11-16 · force majeure
TGP force majeure at Station 542 Unit 2A near De Kalb, MS remains in effect with no restoration timeline. Up to 250,000 Dth/d (0.25 Bcf/d) of Primary firm capacity pathed through Segment 539 BH is at risk of curtailment beginning Timely Cycle for gas day November 17. This Revisio…
Tennessee Gas Pipeline (TGP) · posted 2026-11-05 · effective 2026-11-06 · informational

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, OWS ENRG/TGP BIG SANDY DEHY CRAWFOR (Tennessee Gas Pipeline (TGP) loc 411577) scheduled quantity, gas day November 26, 2026. https://enercast.com/meter/tgp/411577/