Enercast — at the moment it matters
Home / Daily Summary / Supply / Production / Meter

UGI APPALACHIA -DRY RIDGE-GREENE CO.,PA(D)73660/(R)73661

Texas Eastern Transmission (TETCO) · Loc 75660 · Pennsylvania
Processing plant · counted in Supply / Production
Gas day Nov 26
0.142
Bcf/d scheduled
Δ Day-over-day
-0.005
vs Nov 25
7-day average
0.140
Bcf/d
30-day average
0.145
30 of 30 days posted
30-day high
0.193
Nov 2
30-day low
0.122
Nov 4
Operating capacity
0.407
Bcf/d as posted, late_0005 cycle
Utilization
35%
headroom 65%

Scheduled quantities as posted by Texas Eastern Transmission (TETCO) on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the Supply / Production page.

0.000.050.100.150.20Oct 28Nov 2Nov 7Nov 12Nov 17Nov 22 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 260.142-0.005
Nov 250.147+0.005
Nov 240.142+0.010
Nov 230.132+0.000
Nov 220.132-0.010
Nov 210.142-0.002
Nov 200.144-0.005
Nov 190.149+0.015
Nov 180.135+0.007
Nov 170.128+0.000
Nov 160.128-0.005
Nov 150.133+0.005
Nov 140.128+0.000
Nov 130.128-0.010
Nov 120.137-0.012
Nov 110.149+0.010
Nov 100.139-0.010
Nov 90.149+0.004
Nov 80.145-0.007
Nov 70.152+0.005
Nov 60.148+0.010
Nov 50.138+0.016
Nov 40.122-0.012
Nov 30.134-0.059
Nov 20.193+0.012
Nov 10.181+0.007
Oct 310.174-0.010
Oct 300.184+0.041
Oct 290.143-0.019
Oct 280.162—
78 more days on file for this meter, back to August 11, 2026. Full meter-level history is part of Institutional (API and downloads).
Texas Eastern (TETCO)

Texas Eastern (TETCO)State only (Pennsylvania) — the meter's exact site is not geocoded; the ring marks the state, not the point.

Notices that name this point

Text match on the meter’s name or location ID in the notice — last 90 days. A text match is a pointer, not a confirmed capacity impact at this meter.

Texas Eastern Transmission (TETCO) · posted 2026-10-30 · effective 2026-10-16 · informational
Texas Eastern Transmission (TETCO) · posted 2026-10-30 · effective 2026-10-20 · informational
Texas Eastern Transmission (TETCO) · posted 2026-10-30 · effective 2026-10-23 · informational
Recent notices on Texas Eastern Transmission (TETCO)

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Texas Eastern Transmission (TETCO) notices →

Texas Eastern Transmission (TETCO) · posted 2026-11-25 · effective 2026-11-26 · informational
Texas Eastern Transmission (TETCO) · posted 2026-11-12 · effective 2026-11-12 · informational
Texas Eastern Transmission (TETCO) · posted 2026-11-05 · effective 2026-11-07 · informational
Texas Eastern Transmission (TETCO) · posted 2026-10-30 · effective 2026-09-25 · informational
Texas Eastern Transmission (TETCO) · posted 2026-10-30 · effective 2026-10-02 · informational
Texas Eastern Transmission (TETCO) · posted 2026-10-30 · effective 2026-10-02 · capacity constraint
TETCO has declared an unplanned outage between Tompkinsville and Danville Compressor Stations on Line 15 Valve Sections 2-4, requiring an immediate pressure restriction effective Gas Day October 6, 2026. North-to-South capacity on the 30-inch system is reduced to a minimum of app…
Texas Eastern Transmission (TETCO) · posted 2026-10-30 · effective 2026-10-02 · force majeure
TETCO has declared a Force Majeure due to an unplanned outage on its 30-inch system north of Tompkinsville Compressor Station in Kentucky, affecting Line 15 Valve Sections 2-4 and also implicating Danville Compressor Station. The restoration timeline is unknown ('unclear at this …
Texas Eastern Transmission (TETCO) · posted 2026-10-30 · effective 2026-10-07 · capacity constraint
TETCO is providing an update on the unplanned outage on Line 15 between the Tompkinsville and Danville compressor stations (Valve Sections 2-4), originally posted under Notice 183681. Primary Firm nomination restrictions remain in effect with no fixed end date; TETCO targets a re…

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, UGI APPALACHIA -DRY RIDGE-GREENE CO.,PA(D)73660/(R)73661 (Texas Eastern Transmission (TETCO) loc 75660) scheduled quantity, gas day November 26, 2026. https://enercast.com/meter/tetco/75660/