MarkWest-BEALLSVILLE/BOLON RIDGE ROAD, MONROE CO., OH

Texas Eastern Transmission (TETCO) · Loc 73875 · Ohio
Gathering receipt · counted in Supply / Production
Gas day Nov 26
0.376
Bcf/d scheduled
Δ Day-over-day
+0.024
vs Nov 25
7-day average
0.365
Bcf/d
30-day average
0.350
30 of 30 days posted
30-day high
0.429
Nov 11
30-day low
0.002
Oct 29
Operating capacity
0.407
Bcf/d as posted, late_0005 cycle
Utilization
92%
headroom 8%

Scheduled quantities as posted by Texas Eastern Transmission (TETCO) on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the Supply / Production page.

0.000.200.400.60Oct 28Nov 2Nov 7Nov 12Nov 17Nov 22 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 260.376+0.024
Nov 250.352+0.007
Nov 240.345-0.024
Nov 230.369+0.000
Nov 220.369-0.005
Nov 210.374+0.002
Nov 200.372+0.002
Nov 190.370+0.002
Nov 180.368+0.007
Nov 170.362-0.031
Nov 160.392+0.016
Nov 150.376-0.007
Nov 140.383+0.037
Nov 130.346-0.047
Nov 120.393-0.036
Nov 110.429+0.039
Nov 100.390+0.016
Nov 90.374-0.010
Nov 80.384+0.000
Nov 70.384+0.006
Nov 60.378-0.008
Nov 50.386-0.023
Nov 40.409+0.014
Nov 30.395-0.018
Nov 20.413-0.009
Nov 10.422+0.080
Oct 310.342+0.097
Oct 300.245+0.243
Oct 290.002+0.000
Oct 280.002—
78 more days on file for this meter, back to August 11, 2026. Full meter-level history is part of Institutional (API and downloads).
Texas Eastern (TETCO)

Texas Eastern (TETCO)State only (Ohio) — the meter's exact site is not geocoded; the ring marks the state, not the point.

Recent notices on Texas Eastern Transmission (TETCO)

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Texas Eastern Transmission (TETCO) notices →

Texas Eastern Transmission (TETCO) · posted 2026-11-25 · effective 2026-11-26 · informational
Texas Eastern Transmission (TETCO) · posted 2026-11-12 · effective 2026-11-12 · informational
Texas Eastern Transmission (TETCO) · posted 2026-11-05 · effective 2026-11-07 · informational
Texas Eastern Transmission (TETCO) · posted 2026-10-30 · effective 2026-09-25 · informational
Texas Eastern Transmission (TETCO) · posted 2026-10-30 · effective 2026-10-02 · informational
Texas Eastern Transmission (TETCO) · posted 2026-10-30 · effective 2026-10-02 · capacity constraint
TETCO has declared an unplanned outage between Tompkinsville and Danville Compressor Stations on Line 15 Valve Sections 2-4, requiring an immediate pressure restriction effective Gas Day October 6, 2026. North-to-South capacity on the 30-inch system is reduced to a minimum of app…
Texas Eastern Transmission (TETCO) · posted 2026-10-30 · effective 2026-10-02 · force majeure
TETCO has declared a Force Majeure due to an unplanned outage on its 30-inch system north of Tompkinsville Compressor Station in Kentucky, affecting Line 15 Valve Sections 2-4 and also implicating Danville Compressor Station. The restoration timeline is unknown ('unclear at this …
Texas Eastern Transmission (TETCO) · posted 2026-10-30 · effective 2026-10-07 · capacity constraint
TETCO is providing an update on the unplanned outage on Line 15 between the Tompkinsville and Danville compressor stations (Valve Sections 2-4), originally posted under Notice 183681. Primary Firm nomination restrictions remain in effect with no fixed end date; TETCO targets a re…