Enercast — at the moment it matters
Home / Daily Summary / Supply / Production / Meter

NEW GENERATION GAS GATHERING (MOMENTUM - NG3) - AL CORMIER ROAD -

Texas Eastern Transmission (TETCO) · Loc 73979 · Louisiana
Gathering receipt · counted in Supply / Production
Gas day Nov 27
0.368
Bcf/d scheduled
Δ Day-over-day
-0.004
vs Nov 26
7-day average
0.366
Bcf/d
30-day average
0.336
30 of 30 days posted
30-day high
0.568
Oct 31
30-day low
0.000
Nov 12
Operating capacity
0.763
Bcf/d as posted, late_0005 cycle
Utilization
48%
headroom 52%

Scheduled quantities as posted by Texas Eastern Transmission (TETCO) on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the Supply / Production page.

0.000.200.400.60Oct 29Nov 3Nov 8Nov 13Nov 18Nov 23 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 270.368-0.004
Nov 260.372+0.007
Nov 250.364+0.016
Nov 240.349+0.000
Nov 230.349-0.020
Nov 220.369-0.025
Nov 210.394+0.052
Nov 200.342-0.050
Nov 190.392+0.069
Nov 180.323-0.023
Nov 170.346+0.036
Nov 160.309+0.035
Nov 150.274-0.015
Nov 140.289+0.009
Nov 130.281+0.281
Nov 120.000+0.000
Nov 110.000-0.186
Nov 100.186-0.078
Nov 90.264-0.100
Nov 80.364+0.000
Nov 70.364-0.006
Nov 60.370+0.042
Nov 50.328+0.020
Nov 40.308-0.050
Nov 30.358-0.006
Nov 20.364+0.000
Nov 10.364-0.204
Oct 310.568+0.000
Oct 300.568+0.024
Oct 290.543—
79 more days on file for this meter, back to August 11, 2026. Full meter-level history is part of Institutional (API and downloads).
Texas Eastern (TETCO)

Texas Eastern (TETCO)State only (Louisiana) — the meter's exact site is not geocoded; the ring marks the state, not the point.

Recent notices on Texas Eastern Transmission (TETCO)

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Texas Eastern Transmission (TETCO) notices →

Texas Eastern Transmission (TETCO) · posted 2026-11-25 · effective 2026-11-26 · informational
Texas Eastern Transmission (TETCO) · posted 2026-11-12 · effective 2026-11-12 · informational
Texas Eastern Transmission (TETCO) · posted 2026-11-05 · effective 2026-11-07 · informational
Texas Eastern Transmission (TETCO) · posted 2026-10-30 · effective 2026-09-25 · informational
Texas Eastern Transmission (TETCO) · posted 2026-10-30 · effective 2026-10-02 · informational
Texas Eastern Transmission (TETCO) · posted 2026-10-30 · effective 2026-10-02 · capacity constraint
TETCO has declared an unplanned outage between Tompkinsville and Danville Compressor Stations on Line 15 Valve Sections 2-4, requiring an immediate pressure restriction effective Gas Day October 6, 2026. North-to-South capacity on the 30-inch system is reduced to a minimum of app…
Texas Eastern Transmission (TETCO) · posted 2026-10-30 · effective 2026-10-02 · force majeure
TETCO has declared a Force Majeure due to an unplanned outage on its 30-inch system north of Tompkinsville Compressor Station in Kentucky, affecting Line 15 Valve Sections 2-4 and also implicating Danville Compressor Station. The restoration timeline is unknown ('unclear at this …
Texas Eastern Transmission (TETCO) · posted 2026-10-30 · effective 2026-10-07 · capacity constraint
TETCO is providing an update on the unplanned outage on Line 15 between the Tompkinsville and Danville compressor stations (Valve Sections 2-4), originally posted under Notice 183681. Primary Firm nomination restrictions remain in effect with no fixed end date; TETCO targets a re…

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, NEW GENERATION GAS GATHERING (MOMENTUM - NG3) - AL CORMIER ROAD - (Texas Eastern Transmission (TETCO) loc 73979) scheduled quantity, gas day November 27, 2026. https://enercast.com/meter/tetco/73979/