Gas day Nov 26
0.331
Bcf/d scheduled
Δ Day-over-day
-0.027
vs Nov 25
7-day average
0.346
Bcf/d
30-day average
0.344
30 of 30 days posted
30-day high
0.381
Nov 13
30-day low
0.317
Nov 1
Operating capacity
0.637
Bcf/d as posted, late_0005 cycle
Utilization
52%
headroom 48%

Scheduled quantities as posted by Texas Eastern Transmission (TETCO) on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the Supply / Production page.

0.000.100.200.300.40Oct 28Nov 2Nov 7Nov 12Nov 17Nov 22 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 260.331-0.027
Nov 250.358+0.000
Nov 240.358+0.006
Nov 230.352+0.026
Nov 220.326-0.010
Nov 210.336-0.024
Nov 200.360+0.007
Nov 190.353-0.002
Nov 180.354+0.010
Nov 170.344-0.020
Nov 160.364+0.006
Nov 150.358+0.001
Nov 140.357-0.023
Nov 130.381+0.058
Nov 120.322-0.015
Nov 110.338+0.006
Nov 100.331-0.004
Nov 90.336-0.001
Nov 80.337+0.005
Nov 70.332-0.003
Nov 60.334+0.010
Nov 50.325-0.006
Nov 40.331-0.013
Nov 30.344+0.003
Nov 20.341+0.024
Nov 10.317-0.030
Oct 310.347+0.005
Oct 300.341-0.020
Oct 290.362+0.000
Oct 280.361—
78 more days on file for this meter, back to August 11, 2026. Full meter-level history is part of Institutional (API and downloads).
Texas Eastern (TETCO)

Texas Eastern (TETCO)State only (Pennsylvania) — the meter's exact site is not geocoded; the ring marks the state, not the point.

Recent notices on Texas Eastern Transmission (TETCO)

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Texas Eastern Transmission (TETCO) notices →

Texas Eastern Transmission (TETCO) · posted 2026-11-25 · effective 2026-11-26 · informational
Texas Eastern Transmission (TETCO) · posted 2026-11-12 · effective 2026-11-12 · informational
Texas Eastern Transmission (TETCO) · posted 2026-11-05 · effective 2026-11-07 · informational
Texas Eastern Transmission (TETCO) · posted 2026-10-30 · effective 2026-09-25 · informational
Texas Eastern Transmission (TETCO) · posted 2026-10-30 · effective 2026-10-02 · informational
Texas Eastern Transmission (TETCO) · posted 2026-10-30 · effective 2026-10-02 · capacity constraint
TETCO has declared an unplanned outage between Tompkinsville and Danville Compressor Stations on Line 15 Valve Sections 2-4, requiring an immediate pressure restriction effective Gas Day October 6, 2026. North-to-South capacity on the 30-inch system is reduced to a minimum of app…
Texas Eastern Transmission (TETCO) · posted 2026-10-30 · effective 2026-10-02 · force majeure
TETCO has declared a Force Majeure due to an unplanned outage on its 30-inch system north of Tompkinsville Compressor Station in Kentucky, affecting Line 15 Valve Sections 2-4 and also implicating Danville Compressor Station. The restoration timeline is unknown ('unclear at this …
Texas Eastern Transmission (TETCO) · posted 2026-10-30 · effective 2026-10-07 · capacity constraint
TETCO is providing an update on the unplanned outage on Line 15 between the Tompkinsville and Danville compressor stations (Valve Sections 2-4), originally posted under Notice 183681. Primary Firm nomination restrictions remain in effect with no fixed end date; TETCO targets a re…

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, CNX - MCQUAY III - CONE GATHERING, GREENE CO., PA. (Texas Eastern Transmission (TETCO) loc 73733) scheduled quantity, gas day November 26, 2026. https://enercast.com/meter/tetco/73733/