Enercast — at the moment it matters
Home / Daily Summary / Supply / Production / Meter

LOUISIANA ENERGY GATEWAY (LEG) - COONIE JACKSON ROAD - BEAUREGARD

Texas Eastern Transmission (TETCO) · Loc 73980 · Louisiana
Gathering receipt · counted in Supply / Production
Gas day Nov 27
0.263
Bcf/d scheduled
Δ Day-over-day
-0.014
vs Nov 26
7-day average
0.276
Bcf/d
30-day average
0.280
30 of 30 days posted
30-day high
0.371
Nov 20
30-day low
0.134
Nov 10
Operating capacity
0.570
Bcf/d as posted, late_0005 cycle
Utilization
46%
headroom 54%

Scheduled quantities as posted by Texas Eastern Transmission (TETCO) on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the Supply / Production page.

0.000.100.200.300.40Oct 29Nov 3Nov 8Nov 13Nov 18Nov 23 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 270.263-0.014
Nov 260.277-0.047
Nov 250.324+0.074
Nov 240.250-0.022
Nov 230.272+0.000
Nov 220.272+0.000
Nov 210.272-0.099
Nov 200.371+0.045
Nov 190.325-0.042
Nov 180.367+0.044
Nov 170.323+0.031
Nov 160.291+0.000
Nov 150.291+0.000
Nov 140.291+0.112
Nov 130.179-0.184
Nov 120.363+0.047
Nov 110.316+0.183
Nov 100.134-0.056
Nov 90.190+0.000
Nov 80.190+0.000
Nov 70.190-0.014
Nov 60.204+0.037
Nov 50.167-0.001
Nov 40.169-0.150
Nov 30.319-0.033
Nov 20.352+0.000
Nov 10.352-0.016
Oct 310.369+0.000
Oct 300.369+0.025
Oct 290.344—
79 more days on file for this meter, back to August 11, 2026. Full meter-level history is part of Institutional (API and downloads).
Texas Eastern (TETCO)

Texas Eastern (TETCO)State only (Louisiana) — the meter's exact site is not geocoded; the ring marks the state, not the point.

Recent notices on Texas Eastern Transmission (TETCO)

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Texas Eastern Transmission (TETCO) notices →

Texas Eastern Transmission (TETCO) · posted 2026-11-25 · effective 2026-11-26 · informational
Texas Eastern Transmission (TETCO) · posted 2026-11-12 · effective 2026-11-12 · informational
Texas Eastern Transmission (TETCO) · posted 2026-11-05 · effective 2026-11-07 · informational
Texas Eastern Transmission (TETCO) · posted 2026-10-30 · effective 2026-09-25 · informational
Texas Eastern Transmission (TETCO) · posted 2026-10-30 · effective 2026-10-02 · informational
Texas Eastern Transmission (TETCO) · posted 2026-10-30 · effective 2026-10-02 · capacity constraint
TETCO has declared an unplanned outage between Tompkinsville and Danville Compressor Stations on Line 15 Valve Sections 2-4, requiring an immediate pressure restriction effective Gas Day October 6, 2026. North-to-South capacity on the 30-inch system is reduced to a minimum of app…
Texas Eastern Transmission (TETCO) · posted 2026-10-30 · effective 2026-10-02 · force majeure
TETCO has declared a Force Majeure due to an unplanned outage on its 30-inch system north of Tompkinsville Compressor Station in Kentucky, affecting Line 15 Valve Sections 2-4 and also implicating Danville Compressor Station. The restoration timeline is unknown ('unclear at this …
Texas Eastern Transmission (TETCO) · posted 2026-10-30 · effective 2026-10-07 · capacity constraint
TETCO is providing an update on the unplanned outage on Line 15 between the Tompkinsville and Danville compressor stations (Valve Sections 2-4), originally posted under Notice 183681. Primary Firm nomination restrictions remain in effect with no fixed end date; TETCO targets a re…

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, LOUISIANA ENERGY GATEWAY (LEG) - COONIE JACKSON ROAD - BEAUREGARD (Texas Eastern Transmission (TETCO) loc 73980) scheduled quantity, gas day November 27, 2026. https://enercast.com/meter/tetco/73980/