Gas day Nov 27
0.256
Bcf/d scheduled
Δ Day-over-day
+0.006
vs Nov 26
7-day average
0.244
Bcf/d
30-day average
0.231
30 of 30 days posted
30-day high
0.302
Nov 14
30-day low
0.000
Nov 12
Operating capacity
0.509
Bcf/d as posted, late_0005 cycle
Utilization
50%
headroom 50%

Scheduled quantities as posted by Texas Eastern Transmission (TETCO) on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the Supply / Production page.

0.000.100.200.300.40Oct 29Nov 3Nov 8Nov 13Nov 18Nov 23 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 270.256+0.006
Nov 260.249-0.001
Nov 250.250-0.013
Nov 240.264+0.033
Nov 230.230+0.001
Nov 220.229-0.000
Nov 210.230+0.008
Nov 200.221-0.033
Nov 190.255+0.029
Nov 180.225-0.016
Nov 170.241-0.045
Nov 160.286-0.006
Nov 150.292-0.009
Nov 140.302+0.020
Nov 130.281+0.281
Nov 120.000-0.043
Nov 110.043-0.069
Nov 100.112-0.110
Nov 90.222-0.018
Nov 80.239-0.003
Nov 70.242-0.002
Nov 60.244-0.054
Nov 50.298+0.035
Nov 40.263+0.078
Nov 30.185-0.072
Nov 20.257-0.001
Nov 10.257+0.003
Oct 310.254+0.000
Oct 300.254-0.008
Oct 290.262—
79 more days on file for this meter, back to August 11, 2026. Full meter-level history is part of Institutional (API and downloads).
Texas Eastern (TETCO)

Texas Eastern (TETCO)State only (Louisiana) — the meter's exact site is not geocoded; the ring marks the state, not the point.

Recent notices on Texas Eastern Transmission (TETCO)

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Texas Eastern Transmission (TETCO) notices →

Texas Eastern Transmission (TETCO) · posted 2026-11-25 · effective 2026-11-26 · informational
Texas Eastern Transmission (TETCO) · posted 2026-11-12 · effective 2026-11-12 · informational
Texas Eastern Transmission (TETCO) · posted 2026-11-05 · effective 2026-11-07 · informational
Texas Eastern Transmission (TETCO) · posted 2026-10-30 · effective 2026-09-25 · informational
Texas Eastern Transmission (TETCO) · posted 2026-10-30 · effective 2026-10-02 · informational
Texas Eastern Transmission (TETCO) · posted 2026-10-30 · effective 2026-10-02 · capacity constraint
TETCO has declared an unplanned outage between Tompkinsville and Danville Compressor Stations on Line 15 Valve Sections 2-4, requiring an immediate pressure restriction effective Gas Day October 6, 2026. North-to-South capacity on the 30-inch system is reduced to a minimum of app…
Texas Eastern Transmission (TETCO) · posted 2026-10-30 · effective 2026-10-02 · force majeure
TETCO has declared a Force Majeure due to an unplanned outage on its 30-inch system north of Tompkinsville Compressor Station in Kentucky, affecting Line 15 Valve Sections 2-4 and also implicating Danville Compressor Station. The restoration timeline is unknown ('unclear at this …
Texas Eastern Transmission (TETCO) · posted 2026-10-30 · effective 2026-10-07 · capacity constraint
TETCO is providing an update on the unplanned outage on Line 15 between the Tompkinsville and Danville compressor stations (Valve Sections 2-4), originally posted under Notice 183681. Primary Firm nomination restrictions remain in effect with no fixed end date; TETCO targets a re…

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.