Gas day Nov 27
0.366
Bcf/d scheduled
Δ Day-over-day
+0.013
vs Nov 26
7-day average
0.411
Bcf/d
30-day average
0.386
30 of 30 days posted
30-day high
0.508
Nov 14
30-day low
0.185
Nov 5
Operating capacity
0.629
Bcf/d as posted, late_0005 cycle
Utilization
58%
headroom 42%

Scheduled quantities as posted by Texas Eastern Transmission (TETCO) on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the Supply / Production page.

0.000.200.400.60Oct 29Nov 3Nov 8Nov 13Nov 18Nov 23 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 270.366+0.013
Nov 260.354-0.067
Nov 250.421-0.031
Nov 240.452+0.029
Nov 230.423+0.005
Nov 220.418-0.025
Nov 210.443+0.067
Nov 200.376-0.024
Nov 190.401-0.050
Nov 180.450+0.043
Nov 170.408+0.074
Nov 160.334-0.170
Nov 150.504-0.004
Nov 140.508+0.012
Nov 130.496+0.041
Nov 120.456+0.057
Nov 110.399+0.009
Nov 100.390+0.136
Nov 90.254-0.099
Nov 80.353-0.039
Nov 70.392+0.038
Nov 60.354+0.168
Nov 50.185-0.080
Nov 40.265+0.014
Nov 30.251+0.022
Nov 20.229-0.017
Nov 10.245-0.250
Oct 310.496+0.008
Oct 300.488+0.031
Oct 290.457—
79 more days on file for this meter, back to August 11, 2026. Full meter-level history is part of Institutional (API and downloads).
Texas Eastern (TETCO)

Texas Eastern (TETCO)State only (West Virginia) — the meter's exact site is not geocoded; the ring marks the state, not the point.

Recent notices on Texas Eastern Transmission (TETCO)

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Texas Eastern Transmission (TETCO) notices →

Texas Eastern Transmission (TETCO) · posted 2026-11-25 · effective 2026-11-26 · informational
Texas Eastern Transmission (TETCO) · posted 2026-11-12 · effective 2026-11-12 · informational
Texas Eastern Transmission (TETCO) · posted 2026-11-05 · effective 2026-11-07 · informational
Texas Eastern Transmission (TETCO) · posted 2026-10-30 · effective 2026-09-25 · informational
Texas Eastern Transmission (TETCO) · posted 2026-10-30 · effective 2026-10-02 · informational
Texas Eastern Transmission (TETCO) · posted 2026-10-30 · effective 2026-10-02 · capacity constraint
TETCO has declared an unplanned outage between Tompkinsville and Danville Compressor Stations on Line 15 Valve Sections 2-4, requiring an immediate pressure restriction effective Gas Day October 6, 2026. North-to-South capacity on the 30-inch system is reduced to a minimum of app…
Texas Eastern Transmission (TETCO) · posted 2026-10-30 · effective 2026-10-02 · force majeure
TETCO has declared a Force Majeure due to an unplanned outage on its 30-inch system north of Tompkinsville Compressor Station in Kentucky, affecting Line 15 Valve Sections 2-4 and also implicating Danville Compressor Station. The restoration timeline is unknown ('unclear at this …
Texas Eastern Transmission (TETCO) · posted 2026-10-30 · effective 2026-10-07 · capacity constraint
TETCO is providing an update on the unplanned outage on Line 15 between the Tompkinsville and Danville compressor stations (Valve Sections 2-4), originally posted under Notice 183681. Primary Firm nomination restrictions remain in effect with no fixed end date; TETCO targets a re…