Gas day Nov 26
-0.001
Bcf/d scheduled
Δ Day-over-day
+0.009
vs Nov 25
7-day average
-0.009
Bcf/d
30-day average
-0.024
30 of 30 days posted
30-day high
-0.001
Nov 26
30-day low
-0.062
Nov 6
Operating capacity
0.196
Bcf/d as posted, late_0005 cycle
Utilization
1%
headroom 99%

Scheduled quantities as posted by Texas Eastern Transmission (TETCO) on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the Supply / Production page.

-0.080-0.060-0.040-0.0200.000Oct 28Nov 2Nov 7Nov 12Nov 17Nov 22 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 26-0.001+0.009
Nov 25-0.010-0.002
Nov 24-0.008+0.001
Nov 23-0.009+0.000
Nov 22-0.009+0.006
Nov 21-0.015-0.008
Nov 20-0.007+0.020
Nov 19-0.027+0.002
Nov 18-0.029-0.019
Nov 17-0.010-0.001
Nov 16-0.009+0.045
Nov 15-0.054-0.022
Nov 14-0.032-0.018
Nov 13-0.014-0.005
Nov 12-0.009+0.026
Nov 11-0.036+0.004
Nov 10-0.040-0.001
Nov 9-0.038-0.012
Nov 8-0.027+0.017
Nov 7-0.043+0.018
Nov 6-0.062-0.028
Nov 5-0.034+0.016
Nov 4-0.050-0.027
Nov 3-0.023+0.037
Nov 2-0.060-0.028
Nov 1-0.032-0.028
Oct 31-0.004+0.000
Oct 30-0.004+0.000
Oct 29-0.004+0.010
Oct 28-0.014—
78 more days on file for this meter, back to August 11, 2026. Full meter-level history is part of Institutional (API and downloads).
Texas Eastern (TETCO)

Texas Eastern (TETCO)State only (Louisiana) — the meter's exact site is not geocoded; the ring marks the state, not the point.

Recent notices on Texas Eastern Transmission (TETCO)

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Texas Eastern Transmission (TETCO) notices →

Texas Eastern Transmission (TETCO) · posted 2026-11-25 · effective 2026-11-26 · informational
Texas Eastern Transmission (TETCO) · posted 2026-11-12 · effective 2026-11-12 · informational
Texas Eastern Transmission (TETCO) · posted 2026-11-05 · effective 2026-11-07 · informational
Texas Eastern Transmission (TETCO) · posted 2026-10-30 · effective 2026-09-25 · informational
Texas Eastern Transmission (TETCO) · posted 2026-10-30 · effective 2026-10-02 · informational
Texas Eastern Transmission (TETCO) · posted 2026-10-30 · effective 2026-10-02 · capacity constraint
TETCO has declared an unplanned outage between Tompkinsville and Danville Compressor Stations on Line 15 Valve Sections 2-4, requiring an immediate pressure restriction effective Gas Day October 6, 2026. North-to-South capacity on the 30-inch system is reduced to a minimum of app…
Texas Eastern Transmission (TETCO) · posted 2026-10-30 · effective 2026-10-02 · force majeure
TETCO has declared a Force Majeure due to an unplanned outage on its 30-inch system north of Tompkinsville Compressor Station in Kentucky, affecting Line 15 Valve Sections 2-4 and also implicating Danville Compressor Station. The restoration timeline is unknown ('unclear at this …
Texas Eastern Transmission (TETCO) · posted 2026-10-30 · effective 2026-10-07 · capacity constraint
TETCO is providing an update on the unplanned outage on Line 15 between the Tompkinsville and Danville compressor stations (Valve Sections 2-4), originally posted under Notice 183681. Primary Firm nomination restrictions remain in effect with no fixed end date; TETCO targets a re…

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, BRIDGELINE - TALLYHO (D72628/R76628) (Texas Eastern Transmission (TETCO) loc 75628) scheduled quantity, gas day November 26, 2026. https://enercast.com/meter/tetco/75628/