Enercast — at the moment it matters
Home / Daily Summary / Supply / Production / Meter

Williams/Shamrock N. Salem Rd, Fayette Co., PA.

Texas Eastern Transmission (TETCO) · Loc 73673 · Pennsylvania
Gathering receipt · counted in Supply / Production
Gas day Nov 26
0.240
Bcf/d scheduled
Δ Day-over-day
-0.047
vs Nov 25
7-day average
0.236
Bcf/d
30-day average
0.207
30 of 30 days posted
30-day high
0.287
Nov 25
30-day low
0.178
Nov 3
Operating capacity
0.413
Bcf/d as posted, late_0005 cycle
Utilization
58%
headroom 42%

Scheduled quantities as posted by Texas Eastern Transmission (TETCO) on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the Supply / Production page.

0.000.100.200.30Oct 28Nov 2Nov 7Nov 12Nov 17Nov 22 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 260.240-0.047
Nov 250.287+0.012
Nov 240.275+0.048
Nov 230.228+0.013
Nov 220.214+0.030
Nov 210.184-0.040
Nov 200.224-0.010
Nov 190.234+0.011
Nov 180.223+0.020
Nov 170.203-0.013
Nov 160.216-0.000
Nov 150.216-0.002
Nov 140.219+0.021
Nov 130.198+0.019
Nov 120.179-0.016
Nov 110.195+0.015
Nov 100.180-0.010
Nov 90.190-0.015
Nov 80.205+0.010
Nov 70.195+0.014
Nov 60.181-0.007
Nov 50.188+0.002
Nov 40.187+0.008
Nov 30.178-0.011
Nov 20.189+0.009
Nov 10.180-0.008
Oct 310.188+0.000
Oct 300.188-0.027
Oct 290.215+0.016
Oct 280.199—
78 more days on file for this meter, back to August 11, 2026. Full meter-level history is part of Institutional (API and downloads).
Texas Eastern (TETCO)

Texas Eastern (TETCO)State only (Pennsylvania) — the meter's exact site is not geocoded; the ring marks the state, not the point.

Recent notices on Texas Eastern Transmission (TETCO)

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Texas Eastern Transmission (TETCO) notices →

Texas Eastern Transmission (TETCO) · posted 2026-11-25 · effective 2026-11-26 · informational
Texas Eastern Transmission (TETCO) · posted 2026-11-12 · effective 2026-11-12 · informational
Texas Eastern Transmission (TETCO) · posted 2026-11-05 · effective 2026-11-07 · informational
Texas Eastern Transmission (TETCO) · posted 2026-10-30 · effective 2026-09-25 · informational
Texas Eastern Transmission (TETCO) · posted 2026-10-30 · effective 2026-10-02 · informational
Texas Eastern Transmission (TETCO) · posted 2026-10-30 · effective 2026-10-02 · capacity constraint
TETCO has declared an unplanned outage between Tompkinsville and Danville Compressor Stations on Line 15 Valve Sections 2-4, requiring an immediate pressure restriction effective Gas Day October 6, 2026. North-to-South capacity on the 30-inch system is reduced to a minimum of app…
Texas Eastern Transmission (TETCO) · posted 2026-10-30 · effective 2026-10-02 · force majeure
TETCO has declared a Force Majeure due to an unplanned outage on its 30-inch system north of Tompkinsville Compressor Station in Kentucky, affecting Line 15 Valve Sections 2-4 and also implicating Danville Compressor Station. The restoration timeline is unknown ('unclear at this …
Texas Eastern Transmission (TETCO) · posted 2026-10-30 · effective 2026-10-07 · capacity constraint
TETCO is providing an update on the unplanned outage on Line 15 between the Tompkinsville and Danville compressor stations (Valve Sections 2-4), originally posted under Notice 183681. Primary Firm nomination restrictions remain in effect with no fixed end date; TETCO targets a re…

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, Williams/Shamrock N. Salem Rd, Fayette Co., PA. (Texas Eastern Transmission (TETCO) loc 73673) scheduled quantity, gas day November 26, 2026. https://enercast.com/meter/tetco/73673/