Gas day Nov 26
0.220
Bcf/d scheduled
Δ Day-over-day
-0.001
vs Nov 25
7-day average
0.212
Bcf/d
30-day average
0.191
30 of 30 days posted
30-day high
0.224
Nov 23
30-day low
0.143
Nov 10
Operating capacity
0.240
Bcf/d as posted, late_0005 cycle
Utilization
92%
headroom 8%

Scheduled quantities as posted by Texas Eastern Transmission (TETCO) on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the Supply / Production page.

0.000.100.200.30Oct 28Nov 2Nov 7Nov 12Nov 17Nov 22 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 260.220-0.001
Nov 250.220+0.013
Nov 240.207-0.016
Nov 230.224+0.009
Nov 220.215+0.000
Nov 210.215+0.029
Nov 200.186-0.024
Nov 190.210+0.055
Nov 180.155-0.026
Nov 170.181-0.032
Nov 160.212-0.002
Nov 150.214+0.003
Nov 140.212+0.026
Nov 130.186+0.037
Nov 120.148+0.000
Nov 110.148+0.005
Nov 100.143-0.050
Nov 90.194+0.000
Nov 80.194-0.007
Nov 70.201+0.003
Nov 60.198+0.029
Nov 50.168+0.003
Nov 40.165+0.002
Nov 30.163-0.002
Nov 20.165+0.000
Nov 10.165-0.053
Oct 310.218+0.000
Oct 300.218+0.021
Oct 290.197-0.005
Oct 280.202—
78 more days on file for this meter, back to August 11, 2026. Full meter-level history is part of Institutional (API and downloads).
Texas Eastern (TETCO)

Texas Eastern (TETCO)State only (Texas) — the meter's exact site is not geocoded; the ring marks the state, not the point.

Recent notices on Texas Eastern Transmission (TETCO)

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Texas Eastern Transmission (TETCO) notices →

Texas Eastern Transmission (TETCO) · posted 2026-11-25 · effective 2026-11-26 · informational
Texas Eastern Transmission (TETCO) · posted 2026-11-12 · effective 2026-11-12 · informational
Texas Eastern Transmission (TETCO) · posted 2026-11-05 · effective 2026-11-07 · informational
Texas Eastern Transmission (TETCO) · posted 2026-10-30 · effective 2026-09-25 · informational
Texas Eastern Transmission (TETCO) · posted 2026-10-30 · effective 2026-10-02 · informational
Texas Eastern Transmission (TETCO) · posted 2026-10-30 · effective 2026-10-02 · capacity constraint
TETCO has declared an unplanned outage between Tompkinsville and Danville Compressor Stations on Line 15 Valve Sections 2-4, requiring an immediate pressure restriction effective Gas Day October 6, 2026. North-to-South capacity on the 30-inch system is reduced to a minimum of app…
Texas Eastern Transmission (TETCO) · posted 2026-10-30 · effective 2026-10-02 · force majeure
TETCO has declared a Force Majeure due to an unplanned outage on its 30-inch system north of Tompkinsville Compressor Station in Kentucky, affecting Line 15 Valve Sections 2-4 and also implicating Danville Compressor Station. The restoration timeline is unknown ('unclear at this …
Texas Eastern Transmission (TETCO) · posted 2026-10-30 · effective 2026-10-07 · capacity constraint
TETCO is providing an update on the unplanned outage on Line 15 between the Tompkinsville and Danville compressor stations (Valve Sections 2-4), originally posted under Notice 183681. Primary Firm nomination restrictions remain in effect with no fixed end date; TETCO targets a re…

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, Matterhorn Express Pipeline Hillboldt Road Austin Co., TX (Texas Eastern Transmission (TETCO) loc 73976) scheduled quantity, gas day November 26, 2026. https://enercast.com/meter/tetco/73976/