MIDCOAST VIDOR INTERCONNECT MANSFIELD FERRY ROAD ORANGE CO

Texas Eastern Transmission (TETCO) · Loc 73921 · Texas
Intrastate interconnect · counted in Supply / Production
Gas day Nov 27
0.116
Bcf/d scheduled
Δ Day-over-day
+0.000
vs Nov 26
7-day average
0.120
Bcf/d
30-day average
0.118
30 of 30 days posted
30-day high
0.135
Nov 9
30-day low
0.069
Nov 10
Operating capacity
0.254
Bcf/d as posted, late_0005 cycle
Utilization
45%
headroom 55%

Scheduled quantities as posted by Texas Eastern Transmission (TETCO) on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the Supply / Production page.

0.000.050.100.15Oct 29Nov 3Nov 8Nov 13Nov 18Nov 23 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 270.116+0.000
Nov 260.116+0.001
Nov 250.115+0.000
Nov 240.115-0.011
Nov 230.126+0.000
Nov 220.126+0.000
Nov 210.126+0.025
Nov 200.101-0.012
Nov 190.113+0.006
Nov 180.106-0.001
Nov 170.108-0.025
Nov 160.133+0.000
Nov 150.133+0.001
Nov 140.131-0.001
Nov 130.132+0.015
Nov 120.117+0.000
Nov 110.117+0.049
Nov 100.069-0.066
Nov 90.135+0.000
Nov 80.135+0.000
Nov 70.135+0.015
Nov 60.120+0.003
Nov 50.117+0.003
Nov 40.114+0.002
Nov 30.113-0.007
Nov 20.119-0.005
Nov 10.124+0.010
Oct 310.114+0.000
Oct 300.114+0.014
Oct 290.100—
79 more days on file for this meter, back to August 11, 2026. Full meter-level history is part of Institutional (API and downloads).
Texas Eastern (TETCO)

Texas Eastern (TETCO)State only (Texas) — the meter's exact site is not geocoded; the ring marks the state, not the point.

Recent notices on Texas Eastern Transmission (TETCO)

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Texas Eastern Transmission (TETCO) notices →

Texas Eastern Transmission (TETCO) · posted 2026-11-25 · effective 2026-11-26 · informational
Texas Eastern Transmission (TETCO) · posted 2026-11-12 · effective 2026-11-12 · informational
Texas Eastern Transmission (TETCO) · posted 2026-11-05 · effective 2026-11-07 · informational
Texas Eastern Transmission (TETCO) · posted 2026-10-30 · effective 2026-09-25 · informational
Texas Eastern Transmission (TETCO) · posted 2026-10-30 · effective 2026-10-02 · informational
Texas Eastern Transmission (TETCO) · posted 2026-10-30 · effective 2026-10-02 · capacity constraint
TETCO has declared an unplanned outage between Tompkinsville and Danville Compressor Stations on Line 15 Valve Sections 2-4, requiring an immediate pressure restriction effective Gas Day October 6, 2026. North-to-South capacity on the 30-inch system is reduced to a minimum of app…
Texas Eastern Transmission (TETCO) · posted 2026-10-30 · effective 2026-10-02 · force majeure
TETCO has declared a Force Majeure due to an unplanned outage on its 30-inch system north of Tompkinsville Compressor Station in Kentucky, affecting Line 15 Valve Sections 2-4 and also implicating Danville Compressor Station. The restoration timeline is unknown ('unclear at this …
Texas Eastern Transmission (TETCO) · posted 2026-10-30 · effective 2026-10-07 · capacity constraint
TETCO is providing an update on the unplanned outage on Line 15 between the Tompkinsville and Danville compressor stations (Valve Sections 2-4), originally posted under Notice 183681. Primary Firm nomination restrictions remain in effect with no fixed end date; TETCO targets a re…

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.