Enercast — at the moment it matters
Home / Daily Summary / Supply / Production / Meter

Markwest Utica Seneca Monroe Co., OH

Texas Eastern Transmission (TETCO) · Loc 73812 · Ohio
Processing plant · counted in Supply / Production
Gas day Nov 26
0.203
Bcf/d scheduled
Δ Day-over-day
+0.040
vs Nov 25
7-day average
0.188
Bcf/d
30-day average
0.175
30 of 30 days posted
30-day high
0.223
Oct 28
30-day low
0.090
Nov 17
Operating capacity
0.509
Bcf/d as posted, late_0005 cycle
Utilization
40%
headroom 60%

Scheduled quantities as posted by Texas Eastern Transmission (TETCO) on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the Supply / Production page.

0.000.100.200.30Oct 28Nov 2Nov 7Nov 12Nov 17Nov 22 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 260.203+0.040
Nov 250.163-0.021
Nov 240.184-0.009
Nov 230.193+0.000
Nov 220.193+0.000
Nov 210.193+0.005
Nov 200.188+0.020
Nov 190.168+0.073
Nov 180.096+0.005
Nov 170.090-0.052
Nov 160.143-0.014
Nov 150.157-0.000
Nov 140.157-0.011
Nov 130.167+0.003
Nov 120.164-0.013
Nov 110.177-0.020
Nov 100.198+0.052
Nov 90.145-0.040
Nov 80.185+0.000
Nov 70.185-0.008
Nov 60.193+0.002
Nov 50.191+0.007
Nov 40.185-0.010
Nov 30.194-0.004
Nov 20.199+0.022
Nov 10.176-0.006
Oct 310.182+0.000
Oct 300.182+0.022
Oct 290.160-0.063
Oct 280.223—
78 more days on file for this meter, back to August 11, 2026. Full meter-level history is part of Institutional (API and downloads).
Texas Eastern (TETCO)

Texas Eastern (TETCO)State only (Ohio) — the meter's exact site is not geocoded; the ring marks the state, not the point.

Recent notices on Texas Eastern Transmission (TETCO)

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Texas Eastern Transmission (TETCO) notices →

Texas Eastern Transmission (TETCO) · posted 2026-11-25 · effective 2026-11-26 · informational
Texas Eastern Transmission (TETCO) · posted 2026-11-12 · effective 2026-11-12 · informational
Texas Eastern Transmission (TETCO) · posted 2026-11-05 · effective 2026-11-07 · informational
Texas Eastern Transmission (TETCO) · posted 2026-10-30 · effective 2026-09-25 · informational
Texas Eastern Transmission (TETCO) · posted 2026-10-30 · effective 2026-10-02 · informational
Texas Eastern Transmission (TETCO) · posted 2026-10-30 · effective 2026-10-02 · capacity constraint
TETCO has declared an unplanned outage between Tompkinsville and Danville Compressor Stations on Line 15 Valve Sections 2-4, requiring an immediate pressure restriction effective Gas Day October 6, 2026. North-to-South capacity on the 30-inch system is reduced to a minimum of app…
Texas Eastern Transmission (TETCO) · posted 2026-10-30 · effective 2026-10-02 · force majeure
TETCO has declared a Force Majeure due to an unplanned outage on its 30-inch system north of Tompkinsville Compressor Station in Kentucky, affecting Line 15 Valve Sections 2-4 and also implicating Danville Compressor Station. The restoration timeline is unknown ('unclear at this …
Texas Eastern Transmission (TETCO) · posted 2026-10-30 · effective 2026-10-07 · capacity constraint
TETCO is providing an update on the unplanned outage on Line 15 between the Tompkinsville and Danville compressor stations (Valve Sections 2-4), originally posted under Notice 183681. Primary Firm nomination restrictions remain in effect with no fixed end date; TETCO targets a re…

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, Markwest Utica Seneca Monroe Co., OH (Texas Eastern Transmission (TETCO) loc 73812) scheduled quantity, gas day November 26, 2026. https://enercast.com/meter/tetco/73812/