MARK WEST - MAJORSVILLE, MARSHALL CO., WVA

Texas Eastern Transmission (TETCO) · Loc 73734 · West Virginia
Processing plant · counted in Supply / Production
Gas day Nov 26
0.037
Bcf/d scheduled
Δ Day-over-day
-0.042
vs Nov 25
7-day average
0.078
Bcf/d
30-day average
0.070
30 of 30 days posted
30-day high
0.131
Nov 1
30-day low
0.016
Nov 19
Operating capacity
0.561
Bcf/d as posted, late_0005 cycle
Utilization
7%
headroom 93%

Scheduled quantities as posted by Texas Eastern Transmission (TETCO) on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the Supply / Production page.

0.000.050.100.15Oct 28Nov 2Nov 7Nov 12Nov 17Nov 22 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 260.037-0.042
Nov 250.079-0.022
Nov 240.101+0.020
Nov 230.080-0.009
Nov 220.089-0.001
Nov 210.090+0.024
Nov 200.067+0.051
Nov 190.016-0.063
Nov 180.078+0.006
Nov 170.072-0.006
Nov 160.078+0.008
Nov 150.070-0.005
Nov 140.075-0.004
Nov 130.079+0.022
Nov 120.057+0.010
Nov 110.047-0.043
Nov 100.089+0.038
Nov 90.051-0.012
Nov 80.064+0.003
Nov 70.061+0.024
Nov 60.037+0.006
Nov 50.031+0.003
Nov 40.028-0.022
Nov 30.049-0.032
Nov 20.081-0.050
Nov 10.131+0.033
Oct 310.099-0.021
Oct 300.119+0.036
Oct 290.083+0.013
Oct 280.070—
78 more days on file for this meter, back to August 11, 2026. Full meter-level history is part of Institutional (API and downloads).
Texas Eastern (TETCO)

Texas Eastern (TETCO)State only (West Virginia) — the meter's exact site is not geocoded; the ring marks the state, not the point.

Recent notices on Texas Eastern Transmission (TETCO)

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Texas Eastern Transmission (TETCO) notices →

Texas Eastern Transmission (TETCO) · posted 2026-11-25 · effective 2026-11-26 · informational
Texas Eastern Transmission (TETCO) · posted 2026-11-12 · effective 2026-11-12 · informational
Texas Eastern Transmission (TETCO) · posted 2026-11-05 · effective 2026-11-07 · informational
Texas Eastern Transmission (TETCO) · posted 2026-10-30 · effective 2026-09-25 · informational
Texas Eastern Transmission (TETCO) · posted 2026-10-30 · effective 2026-10-02 · informational
Texas Eastern Transmission (TETCO) · posted 2026-10-30 · effective 2026-10-02 · capacity constraint
TETCO has declared an unplanned outage between Tompkinsville and Danville Compressor Stations on Line 15 Valve Sections 2-4, requiring an immediate pressure restriction effective Gas Day October 6, 2026. North-to-South capacity on the 30-inch system is reduced to a minimum of app…
Texas Eastern Transmission (TETCO) · posted 2026-10-30 · effective 2026-10-02 · force majeure
TETCO has declared a Force Majeure due to an unplanned outage on its 30-inch system north of Tompkinsville Compressor Station in Kentucky, affecting Line 15 Valve Sections 2-4 and also implicating Danville Compressor Station. The restoration timeline is unknown ('unclear at this …
Texas Eastern Transmission (TETCO) · posted 2026-10-30 · effective 2026-10-07 · capacity constraint
TETCO is providing an update on the unplanned outage on Line 15 between the Tompkinsville and Danville compressor stations (Valve Sections 2-4), originally posted under Notice 183681. Primary Firm nomination restrictions remain in effect with no fixed end date; TETCO targets a re…

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, MARK WEST - MAJORSVILLE, MARSHALL CO., WVA (Texas Eastern Transmission (TETCO) loc 73734) scheduled quantity, gas day November 26, 2026. https://enercast.com/meter/tetco/73734/