Blue Racer Midstream-Berne, Monroe Co.,OH

Texas Eastern Transmission (TETCO) · Loc 73732 · Ohio
Gathering receipt · counted in Supply / Production
Gas day Nov 27
0.062
Bcf/d scheduled
Δ Day-over-day
+0.000
vs Nov 26
7-day average
0.065
Bcf/d
30-day average
0.059
30 of 30 days posted
30-day high
0.077
Nov 23
30-day low
0.044
Nov 1
Operating capacity
0.501
Bcf/d as posted, late_0005 cycle
Utilization
12%
headroom 88%

Scheduled quantities as posted by Texas Eastern Transmission (TETCO) on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the Supply / Production page.

0.0000.0200.0400.0600.080Oct 29Nov 3Nov 8Nov 13Nov 18Nov 23 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 270.062+0.000
Nov 260.062-0.002
Nov 250.063+0.004
Nov 240.059-0.017
Nov 230.077+0.014
Nov 220.063-0.004
Nov 210.067+0.011
Nov 200.056-0.005
Nov 190.061+0.005
Nov 180.056-0.002
Nov 170.058-0.002
Nov 160.060+0.000
Nov 150.060+0.000
Nov 140.060+0.006
Nov 130.054+0.005
Nov 120.049-0.005
Nov 110.054-0.007
Nov 100.061+0.013
Nov 90.048+0.000
Nov 80.048+0.000
Nov 70.048+0.000
Nov 60.048-0.007
Nov 50.055-0.007
Nov 40.062+0.003
Nov 30.059+0.005
Nov 20.054+0.010
Nov 10.044-0.030
Oct 310.074+0.000
Oct 300.074+0.006
Oct 290.068—
79 more days on file for this meter, back to August 11, 2026. Full meter-level history is part of Institutional (API and downloads).
Texas Eastern (TETCO)

Texas Eastern (TETCO)State only (Ohio) — the meter's exact site is not geocoded; the ring marks the state, not the point.

Recent notices on Texas Eastern Transmission (TETCO)

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Texas Eastern Transmission (TETCO) notices →

Texas Eastern Transmission (TETCO) · posted 2026-11-25 · effective 2026-11-26 · informational
Texas Eastern Transmission (TETCO) · posted 2026-11-12 · effective 2026-11-12 · informational
Texas Eastern Transmission (TETCO) · posted 2026-11-05 · effective 2026-11-07 · informational
Texas Eastern Transmission (TETCO) · posted 2026-10-30 · effective 2026-09-25 · informational
Texas Eastern Transmission (TETCO) · posted 2026-10-30 · effective 2026-10-02 · informational
Texas Eastern Transmission (TETCO) · posted 2026-10-30 · effective 2026-10-02 · capacity constraint
TETCO has declared an unplanned outage between Tompkinsville and Danville Compressor Stations on Line 15 Valve Sections 2-4, requiring an immediate pressure restriction effective Gas Day October 6, 2026. North-to-South capacity on the 30-inch system is reduced to a minimum of app…
Texas Eastern Transmission (TETCO) · posted 2026-10-30 · effective 2026-10-02 · force majeure
TETCO has declared a Force Majeure due to an unplanned outage on its 30-inch system north of Tompkinsville Compressor Station in Kentucky, affecting Line 15 Valve Sections 2-4 and also implicating Danville Compressor Station. The restoration timeline is unknown ('unclear at this …
Texas Eastern Transmission (TETCO) · posted 2026-10-30 · effective 2026-10-07 · capacity constraint
TETCO is providing an update on the unplanned outage on Line 15 between the Tompkinsville and Danville compressor stations (Valve Sections 2-4), originally posted under Notice 183681. Primary Firm nomination restrictions remain in effect with no fixed end date; TETCO targets a re…

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, Blue Racer Midstream-Berne, Monroe Co.,OH (Texas Eastern Transmission (TETCO) loc 73732) scheduled quantity, gas day November 27, 2026. https://enercast.com/meter/tetco/73732/