Enercast — at the moment it matters
Home / Daily Summary / Supply / Production / Meter

T2 GAS UTILITY LLC/REFUGIO INTERCONNECT

Texas Eastern Transmission (TETCO) · Loc 73719 · Texas
Gathering receipt · counted in Supply / Production
Gas day Nov 27
0.176
Bcf/d scheduled
Δ Day-over-day
+0.001
vs Nov 26
7-day average
0.174
Bcf/d
30-day average
0.165
30 of 30 days posted
30-day high
0.184
Nov 20
30-day low
0.142
Nov 3
Operating capacity
0.204
Bcf/d as posted, late_0005 cycle
Utilization
87%
headroom 13%

Scheduled quantities as posted by Texas Eastern Transmission (TETCO) on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the Supply / Production page.

0.000.050.100.150.20Oct 29Nov 3Nov 8Nov 13Nov 18Nov 23 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 270.176+0.001
Nov 260.175-0.003
Nov 250.178+0.008
Nov 240.170-0.003
Nov 230.173+0.000
Nov 220.173+0.000
Nov 210.173-0.011
Nov 200.184+0.005
Nov 190.179+0.021
Nov 180.159-0.011
Nov 170.170+0.017
Nov 160.152-0.007
Nov 150.160+0.000
Nov 140.160+0.009
Nov 130.150-0.021
Nov 120.171+0.023
Nov 110.148-0.020
Nov 100.168+0.001
Nov 90.167+0.003
Nov 80.164-0.003
Nov 70.167+0.000
Nov 60.167-0.003
Nov 50.170+0.014
Nov 40.156+0.013
Nov 30.142-0.038
Nov 20.180+0.010
Nov 10.170+0.026
Oct 310.145-0.010
Oct 300.155+0.003
Oct 290.152—
79 more days on file for this meter, back to August 11, 2026. Full meter-level history is part of Institutional (API and downloads).
Texas Eastern (TETCO)

Texas Eastern (TETCO)State only (Texas) — the meter's exact site is not geocoded; the ring marks the state, not the point.

Recent notices on Texas Eastern Transmission (TETCO)

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Texas Eastern Transmission (TETCO) notices →

Texas Eastern Transmission (TETCO) · posted 2026-11-25 · effective 2026-11-26 · informational
Texas Eastern Transmission (TETCO) · posted 2026-11-12 · effective 2026-11-12 · informational
Texas Eastern Transmission (TETCO) · posted 2026-11-05 · effective 2026-11-07 · informational
Texas Eastern Transmission (TETCO) · posted 2026-10-30 · effective 2026-09-25 · informational
Texas Eastern Transmission (TETCO) · posted 2026-10-30 · effective 2026-10-02 · informational
Texas Eastern Transmission (TETCO) · posted 2026-10-30 · effective 2026-10-02 · capacity constraint
TETCO has declared an unplanned outage between Tompkinsville and Danville Compressor Stations on Line 15 Valve Sections 2-4, requiring an immediate pressure restriction effective Gas Day October 6, 2026. North-to-South capacity on the 30-inch system is reduced to a minimum of app…
Texas Eastern Transmission (TETCO) · posted 2026-10-30 · effective 2026-10-02 · force majeure
TETCO has declared a Force Majeure due to an unplanned outage on its 30-inch system north of Tompkinsville Compressor Station in Kentucky, affecting Line 15 Valve Sections 2-4 and also implicating Danville Compressor Station. The restoration timeline is unknown ('unclear at this …
Texas Eastern Transmission (TETCO) · posted 2026-10-30 · effective 2026-10-07 · capacity constraint
TETCO is providing an update on the unplanned outage on Line 15 between the Tompkinsville and Danville compressor stations (Valve Sections 2-4), originally posted under Notice 183681. Primary Firm nomination restrictions remain in effect with no fixed end date; TETCO targets a re…

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, T2 GAS UTILITY LLC/REFUGIO INTERCONNECT (Texas Eastern Transmission (TETCO) loc 73719) scheduled quantity, gas day November 27, 2026. https://enercast.com/meter/tetco/73719/