NRG - Cedar Bayou

Texas Eastern Transmission (TETCO) · Loc 73590
Power plant delivery · counted in Power Generation
Gas day Nov 27
0.036
Bcf/d scheduled
Δ Day-over-day
+0.000
vs Nov 26
7-day average
0.063
Bcf/d
30-day average
0.067
30 of 30 days posted
30-day high
0.168
Oct 31
30-day low
0.000
Nov 7
Operating capacity
0.366
Bcf/d as posted, late_0005 cycle
Utilization
10%
headroom 90%

Scheduled quantities as posted by Texas Eastern Transmission (TETCO) on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the Power Generation page.

0.000.050.100.150.20Oct 29Nov 3Nov 8Nov 13Nov 18Nov 23 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 270.036+0.000
Nov 260.036-0.038
Nov 250.075-0.004
Nov 240.079+0.004
Nov 230.075-0.007
Nov 220.082+0.027
Nov 210.055-0.012
Nov 200.067+0.037
Nov 190.030-0.005
Nov 180.035-0.006
Nov 170.041-0.048
Nov 160.089-0.051
Nov 150.140+0.130
Nov 140.010-0.036
Nov 130.046-0.009
Nov 120.055-0.035
Nov 110.090+0.029
Nov 100.061-0.014
Nov 90.075+0.060
Nov 80.015+0.015
Nov 70.000-0.065
Nov 60.065+0.065
Nov 50.000-0.049
Nov 40.049-0.040
Nov 30.089-0.028
Nov 20.117-0.015
Nov 10.133-0.035
Oct 310.168+0.067
Oct 300.101+0.011
Oct 290.090—
79 more days on file for this meter, back to August 11, 2026. Full meter-level history is part of Institutional (API and downloads).
Texas Eastern (TETCO)NRG - Cedar Bayou

Texas Eastern (TETCO)Plant location from EIA Form 860 (plant 3460).

Recent notices on Texas Eastern Transmission (TETCO)

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Texas Eastern Transmission (TETCO) notices →

Texas Eastern Transmission (TETCO) · posted 2026-11-25 · effective 2026-11-26 · informational
Texas Eastern Transmission (TETCO) · posted 2026-11-12 · effective 2026-11-12 · informational
Texas Eastern Transmission (TETCO) · posted 2026-11-05 · effective 2026-11-07 · informational
Texas Eastern Transmission (TETCO) · posted 2026-10-30 · effective 2026-09-25 · informational
Texas Eastern Transmission (TETCO) · posted 2026-10-30 · effective 2026-10-02 · informational
Texas Eastern Transmission (TETCO) · posted 2026-10-30 · effective 2026-10-02 · capacity constraint
TETCO has declared an unplanned outage between Tompkinsville and Danville Compressor Stations on Line 15 Valve Sections 2-4, requiring an immediate pressure restriction effective Gas Day October 6, 2026. North-to-South capacity on the 30-inch system is reduced to a minimum of app…
Texas Eastern Transmission (TETCO) · posted 2026-10-30 · effective 2026-10-02 · force majeure
TETCO has declared a Force Majeure due to an unplanned outage on its 30-inch system north of Tompkinsville Compressor Station in Kentucky, affecting Line 15 Valve Sections 2-4 and also implicating Danville Compressor Station. The restoration timeline is unknown ('unclear at this …
Texas Eastern Transmission (TETCO) · posted 2026-10-30 · effective 2026-10-07 · capacity constraint
TETCO is providing an update on the unplanned outage on Line 15 between the Tompkinsville and Danville compressor stations (Valve Sections 2-4), originally posted under Notice 183681. Primary Firm nomination restrictions remain in effect with no fixed end date; TETCO targets a re…

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, NRG - Cedar Bayou (Texas Eastern Transmission (TETCO) loc 73590) scheduled quantity, gas day November 27, 2026. https://enercast.com/meter/tetco/73590/