Fayette Power, LLC (Fayette Pow)

Texas Eastern Transmission (TETCO) · Loc 73346
Power plant delivery · counted in Power Generation
Gas day Nov 27
0.096
Bcf/d scheduled
Δ Day-over-day
+0.000
vs Nov 26
7-day average
0.104
Bcf/d
30-day average
0.109
30 of 30 days posted
30-day high
0.119
Nov 18
30-day low
0.095
Nov 5
Operating capacity
0.125
Bcf/d as posted, late_0005 cycle
Utilization
77%
headroom 23%

Scheduled quantities as posted by Texas Eastern Transmission (TETCO) on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the Power Generation page.

0.000.050.100.15Oct 29Nov 3Nov 8Nov 13Nov 18Nov 23 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 270.096+0.000
Nov 260.096+0.001
Nov 250.095-0.015
Nov 240.110-0.003
Nov 230.113+0.000
Nov 220.113+0.007
Nov 210.105-0.009
Nov 200.114-0.001
Nov 190.116-0.004
Nov 180.119+0.011
Nov 170.109-0.002
Nov 160.111+0.000
Nov 150.111+0.000
Nov 140.110+0.000
Nov 130.110+0.000
Nov 120.110+0.000
Nov 110.110+0.000
Nov 100.110+0.000
Nov 90.110+0.000
Nov 80.110+0.000
Nov 70.110+0.006
Nov 60.105+0.010
Nov 50.095-0.015
Nov 40.110-0.006
Nov 30.116+0.006
Nov 20.110-0.005
Nov 10.115+0.004
Oct 310.112+0.000
Oct 300.112-0.006
Oct 290.118—
79 more days on file for this meter, back to August 11, 2026. Full meter-level history is part of Institutional (API and downloads).
Texas Eastern (TETCO)Fayette Power, LLC (Fayette Pow)

Texas Eastern (TETCO)Plant location from EIA Form 860 (plant 55516).

Recent notices on Texas Eastern Transmission (TETCO)

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Texas Eastern Transmission (TETCO) notices →

Texas Eastern Transmission (TETCO) · posted 2026-11-25 · effective 2026-11-26 · informational
Texas Eastern Transmission (TETCO) · posted 2026-11-12 · effective 2026-11-12 · informational
Texas Eastern Transmission (TETCO) · posted 2026-11-05 · effective 2026-11-07 · informational
Texas Eastern Transmission (TETCO) · posted 2026-10-30 · effective 2026-09-25 · informational
Texas Eastern Transmission (TETCO) · posted 2026-10-30 · effective 2026-10-02 · informational
Texas Eastern Transmission (TETCO) · posted 2026-10-30 · effective 2026-10-02 · capacity constraint
TETCO has declared an unplanned outage between Tompkinsville and Danville Compressor Stations on Line 15 Valve Sections 2-4, requiring an immediate pressure restriction effective Gas Day October 6, 2026. North-to-South capacity on the 30-inch system is reduced to a minimum of app…
Texas Eastern Transmission (TETCO) · posted 2026-10-30 · effective 2026-10-02 · force majeure
TETCO has declared a Force Majeure due to an unplanned outage on its 30-inch system north of Tompkinsville Compressor Station in Kentucky, affecting Line 15 Valve Sections 2-4 and also implicating Danville Compressor Station. The restoration timeline is unknown ('unclear at this …
Texas Eastern Transmission (TETCO) · posted 2026-10-30 · effective 2026-10-07 · capacity constraint
TETCO is providing an update on the unplanned outage on Line 15 between the Tompkinsville and Danville compressor stations (Valve Sections 2-4), originally posted under Notice 183681. Primary Firm nomination restrictions remain in effect with no fixed end date; TETCO targets a re…

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, Fayette Power, LLC (Fayette Pow) (Texas Eastern Transmission (TETCO) loc 73346) scheduled quantity, gas day November 27, 2026. https://enercast.com/meter/tetco/73346/