Enercast — at the moment it matters
Home / Daily Summary / Power Generation / Meter

WEIR (NEEL-SCHAFFER) - CHOCTAW CO., MS.

Texas Eastern Transmission (TETCO) · Loc 73211
Power plant delivery · counted in Power Generation
Gas day Nov 27
0.098
Bcf/d scheduled
Δ Day-over-day
+0.000
vs Nov 26
7-day average
0.108
Bcf/d
30-day average
0.088
30 of 30 days posted
30-day high
0.139
Nov 20
30-day low
0.000
Oct 31
Operating capacity
0.250
Bcf/d as posted, late_0005 cycle
Utilization
39%
headroom 61%

Scheduled quantities as posted by Texas Eastern Transmission (TETCO) on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the Power Generation page.

0.000.050.100.15Oct 29Nov 3Nov 8Nov 13Nov 18Nov 23 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 270.098+0.000
Nov 260.098-0.006
Nov 250.105+0.004
Nov 240.100-0.019
Nov 230.119+0.000
Nov 220.119+0.000
Nov 210.119-0.020
Nov 200.139+0.002
Nov 190.137+0.009
Nov 180.127+0.003
Nov 170.124+0.017
Nov 160.107+0.000
Nov 150.107+0.000
Nov 140.107+0.000
Nov 130.107+0.011
Nov 120.096+0.000
Nov 110.096-0.025
Nov 100.121+0.024
Nov 90.097-0.004
Nov 80.101+0.000
Nov 70.101-0.015
Nov 60.115+0.021
Nov 50.095+0.011
Nov 40.084+0.058
Nov 30.026+0.025
Nov 20.000+0.000
Nov 10.000+0.000
Oct 310.000+0.000
Oct 300.000+0.000
Oct 290.000—
79 more days on file for this meter, back to August 11, 2026. Full meter-level history is part of Institutional (API and downloads).
Texas Eastern (TETCO)WEIR (NEEL-SCHAFFER) - CHOCTAW CO., MS.

Texas Eastern (TETCO)Plant location from EIA Form 860 (plant 55706).

Recent notices on Texas Eastern Transmission (TETCO)

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Texas Eastern Transmission (TETCO) notices →

Texas Eastern Transmission (TETCO) · posted 2026-11-25 · effective 2026-11-26 · informational
Texas Eastern Transmission (TETCO) · posted 2026-11-12 · effective 2026-11-12 · informational
Texas Eastern Transmission (TETCO) · posted 2026-11-05 · effective 2026-11-07 · informational
Texas Eastern Transmission (TETCO) · posted 2026-10-30 · effective 2026-09-25 · informational
Texas Eastern Transmission (TETCO) · posted 2026-10-30 · effective 2026-10-02 · informational
Texas Eastern Transmission (TETCO) · posted 2026-10-30 · effective 2026-10-02 · capacity constraint
TETCO has declared an unplanned outage between Tompkinsville and Danville Compressor Stations on Line 15 Valve Sections 2-4, requiring an immediate pressure restriction effective Gas Day October 6, 2026. North-to-South capacity on the 30-inch system is reduced to a minimum of app…
Texas Eastern Transmission (TETCO) · posted 2026-10-30 · effective 2026-10-02 · force majeure
TETCO has declared a Force Majeure due to an unplanned outage on its 30-inch system north of Tompkinsville Compressor Station in Kentucky, affecting Line 15 Valve Sections 2-4 and also implicating Danville Compressor Station. The restoration timeline is unknown ('unclear at this …
Texas Eastern Transmission (TETCO) · posted 2026-10-30 · effective 2026-10-07 · capacity constraint
TETCO is providing an update on the unplanned outage on Line 15 between the Tompkinsville and Danville compressor stations (Valve Sections 2-4), originally posted under Notice 183681. Primary Firm nomination restrictions remain in effect with no fixed end date; TETCO targets a re…

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, WEIR (NEEL-SCHAFFER) - CHOCTAW CO., MS. (Texas Eastern Transmission (TETCO) loc 73211) scheduled quantity, gas day November 27, 2026. https://enercast.com/meter/tetco/73211/