Enercast — at the moment it matters
Home / Daily Summary / Power Generation / Meter

Washington Power Generation, LLC

Texas Eastern Transmission (TETCO) · Loc 73297
Power plant delivery · counted in Power Generation
Gas day Nov 27
0.109
Bcf/d scheduled
Δ Day-over-day
+0.000
vs Nov 26
7-day average
0.108
Bcf/d
30-day average
0.108
30 of 30 days posted
30-day high
0.119
Oct 29
30-day low
0.104
Nov 19
Operating capacity
0.127
Bcf/d as posted, late_0005 cycle
Utilization
85%
headroom 15%

Scheduled quantities as posted by Texas Eastern Transmission (TETCO) on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the Power Generation page.

0.000.050.100.15Oct 29Nov 3Nov 8Nov 13Nov 18Nov 23 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 270.109+0.000
Nov 260.109+0.000
Nov 250.109+0.000
Nov 240.108+0.000
Nov 230.108+0.000
Nov 220.108+0.000
Nov 210.108+0.000
Nov 200.108+0.004
Nov 190.104+0.000
Nov 180.104+0.000
Nov 170.104+0.000
Nov 160.104+0.000
Nov 150.104+0.000
Nov 140.104-0.004
Nov 130.109-0.001
Nov 120.110+0.000
Nov 110.109-0.000
Nov 100.110+0.001
Nov 90.109+0.000
Nov 80.109+0.000
Nov 70.109+0.004
Nov 60.106+0.000
Nov 50.106+0.000
Nov 40.106+0.000
Nov 30.106-0.001
Nov 20.107+0.000
Nov 10.107-0.005
Oct 310.112+0.000
Oct 300.112-0.007
Oct 290.119—
79 more days on file for this meter, back to August 11, 2026. Full meter-level history is part of Institutional (API and downloads).
Texas Eastern (TETCO)Washington Power Generation, LLC

Texas Eastern (TETCO)Plant location from EIA Form 860 (plant 55397).

Recent notices on Texas Eastern Transmission (TETCO)

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Texas Eastern Transmission (TETCO) notices →

Texas Eastern Transmission (TETCO) · posted 2026-11-25 · effective 2026-11-26 · informational
Texas Eastern Transmission (TETCO) · posted 2026-11-12 · effective 2026-11-12 · informational
Texas Eastern Transmission (TETCO) · posted 2026-11-05 · effective 2026-11-07 · informational
Texas Eastern Transmission (TETCO) · posted 2026-10-30 · effective 2026-09-25 · informational
Texas Eastern Transmission (TETCO) · posted 2026-10-30 · effective 2026-10-02 · informational
Texas Eastern Transmission (TETCO) · posted 2026-10-30 · effective 2026-10-02 · capacity constraint
TETCO has declared an unplanned outage between Tompkinsville and Danville Compressor Stations on Line 15 Valve Sections 2-4, requiring an immediate pressure restriction effective Gas Day October 6, 2026. North-to-South capacity on the 30-inch system is reduced to a minimum of app…
Texas Eastern Transmission (TETCO) · posted 2026-10-30 · effective 2026-10-02 · force majeure
TETCO has declared a Force Majeure due to an unplanned outage on its 30-inch system north of Tompkinsville Compressor Station in Kentucky, affecting Line 15 Valve Sections 2-4 and also implicating Danville Compressor Station. The restoration timeline is unknown ('unclear at this …
Texas Eastern Transmission (TETCO) · posted 2026-10-30 · effective 2026-10-07 · capacity constraint
TETCO is providing an update on the unplanned outage on Line 15 between the Tompkinsville and Danville compressor stations (Valve Sections 2-4), originally posted under Notice 183681. Primary Firm nomination restrictions remain in effect with no fixed end date; TETCO targets a re…

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, Washington Power Generation, LLC (Texas Eastern Transmission (TETCO) loc 73297) scheduled quantity, gas day November 27, 2026. https://enercast.com/meter/tetco/73297/