Parkway Generation - Sewaren, NJ

Texas Eastern Transmission (TETCO) · Loc 70066
Power plant delivery · counted in Power Generation
Gas day Nov 27
0.258
Bcf/d scheduled
Δ Day-over-day
+0.197
vs Nov 26
7-day average
0.095
Bcf/d
30-day average
0.070
30 of 30 days posted
30-day high
0.258
Nov 27
30-day low
0.043
Nov 13
Operating capacity
0.169
Bcf/d as posted, late_0005 cycle
Utilization
153%
scheduled above operating capacity

Scheduled quantities as posted by Texas Eastern Transmission (TETCO) on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the Power Generation page.

0.000.100.200.30Oct 29Nov 3Nov 8Nov 13Nov 18Nov 23 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 270.258+0.197
Nov 260.062-0.016
Nov 250.078+0.002
Nov 240.076+0.014
Nov 230.062-0.007
Nov 220.069+0.011
Nov 210.058-0.005
Nov 200.063-0.017
Nov 190.080-0.008
Nov 180.087+0.019
Nov 170.068+0.008
Nov 160.060+0.001
Nov 150.059+0.001
Nov 140.058+0.015
Nov 130.043-0.008
Nov 120.051-0.018
Nov 110.070+0.001
Nov 100.068+0.001
Nov 90.067+0.007
Nov 80.061+0.003
Nov 70.058-0.007
Nov 60.065-0.003
Nov 50.068+0.015
Nov 40.053-0.008
Nov 30.061+0.003
Nov 20.058+0.002
Nov 10.056+0.004
Oct 310.052-0.023
Oct 300.075+0.021
Oct 290.054—
79 more days on file for this meter, back to August 11, 2026. Full meter-level history is part of Institutional (API and downloads).
Texas Eastern (TETCO)Parkway Generation - Sewaren, NJ

Texas Eastern (TETCO)Plant location from EIA Form 860 (plant 2411).

Recent notices on Texas Eastern Transmission (TETCO)

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Texas Eastern Transmission (TETCO) notices →

Texas Eastern Transmission (TETCO) · posted 2026-11-25 · effective 2026-11-26 · informational
Texas Eastern Transmission (TETCO) · posted 2026-11-12 · effective 2026-11-12 · informational
Texas Eastern Transmission (TETCO) · posted 2026-11-05 · effective 2026-11-07 · informational
Texas Eastern Transmission (TETCO) · posted 2026-10-30 · effective 2026-09-25 · informational
Texas Eastern Transmission (TETCO) · posted 2026-10-30 · effective 2026-10-02 · informational
Texas Eastern Transmission (TETCO) · posted 2026-10-30 · effective 2026-10-02 · capacity constraint
TETCO has declared an unplanned outage between Tompkinsville and Danville Compressor Stations on Line 15 Valve Sections 2-4, requiring an immediate pressure restriction effective Gas Day October 6, 2026. North-to-South capacity on the 30-inch system is reduced to a minimum of app…
Texas Eastern Transmission (TETCO) · posted 2026-10-30 · effective 2026-10-02 · force majeure
TETCO has declared a Force Majeure due to an unplanned outage on its 30-inch system north of Tompkinsville Compressor Station in Kentucky, affecting Line 15 Valve Sections 2-4 and also implicating Danville Compressor Station. The restoration timeline is unknown ('unclear at this …
Texas Eastern Transmission (TETCO) · posted 2026-10-30 · effective 2026-10-07 · capacity constraint
TETCO is providing an update on the unplanned outage on Line 15 between the Tompkinsville and Danville compressor stations (Valve Sections 2-4), originally posted under Notice 183681. Primary Firm nomination restrictions remain in effect with no fixed end date; TETCO targets a re…