WATERFORD PLANT - WASHINGTON CO., OH

Texas Eastern Transmission (TETCO) · Loc 73334
Power plant delivery · counted in Power Generation
Gas day Nov 27
0.140
Bcf/d scheduled
Δ Day-over-day
+0.000
vs Nov 26
7-day average
0.137
Bcf/d
30-day average
0.121
30 of 30 days posted
30-day high
0.166
Nov 14
30-day low
0.084
Nov 8
Operating capacity
0.159
Bcf/d as posted, late_0005 cycle
Utilization
88%
headroom 12%

Scheduled quantities as posted by Texas Eastern Transmission (TETCO) on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the Power Generation page.

0.000.050.100.150.20Oct 29Nov 3Nov 8Nov 13Nov 18Nov 23 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 270.140+0.000
Nov 260.140+0.000
Nov 250.140+0.005
Nov 240.135+0.010
Nov 230.125-0.015
Nov 220.140+0.000
Nov 210.140-0.005
Nov 200.145+0.005
Nov 190.140+0.005
Nov 180.135+0.000
Nov 170.135-0.005
Nov 160.140-0.000
Nov 150.140-0.026
Nov 140.166+0.011
Nov 130.155+0.005
Nov 120.150+0.015
Nov 110.135+0.035
Nov 100.100+0.015
Nov 90.085+0.001
Nov 80.084-0.008
Nov 70.092-0.003
Nov 60.095-0.006
Nov 50.101+0.006
Nov 40.096+0.001
Nov 30.095+0.005
Nov 20.090+0.000
Nov 10.090-0.010
Oct 310.100+0.000
Oct 300.100-0.005
Oct 290.105—
79 more days on file for this meter, back to August 11, 2026. Full meter-level history is part of Institutional (API and downloads).
Texas Eastern (TETCO)

Texas Eastern (TETCO)Exact site not geocoded — the highlighted line is the pipeline system this meter sits on.

Recent notices on Texas Eastern Transmission (TETCO)

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Texas Eastern Transmission (TETCO) notices →

Texas Eastern Transmission (TETCO) · posted 2026-11-25 · effective 2026-11-26 · informational
Texas Eastern Transmission (TETCO) · posted 2026-11-12 · effective 2026-11-12 · informational
Texas Eastern Transmission (TETCO) · posted 2026-11-05 · effective 2026-11-07 · informational
Texas Eastern Transmission (TETCO) · posted 2026-10-30 · effective 2026-09-25 · informational
Texas Eastern Transmission (TETCO) · posted 2026-10-30 · effective 2026-10-02 · informational
Texas Eastern Transmission (TETCO) · posted 2026-10-30 · effective 2026-10-02 · capacity constraint
TETCO has declared an unplanned outage between Tompkinsville and Danville Compressor Stations on Line 15 Valve Sections 2-4, requiring an immediate pressure restriction effective Gas Day October 6, 2026. North-to-South capacity on the 30-inch system is reduced to a minimum of app…
Texas Eastern Transmission (TETCO) · posted 2026-10-30 · effective 2026-10-02 · force majeure
TETCO has declared a Force Majeure due to an unplanned outage on its 30-inch system north of Tompkinsville Compressor Station in Kentucky, affecting Line 15 Valve Sections 2-4 and also implicating Danville Compressor Station. The restoration timeline is unknown ('unclear at this …
Texas Eastern Transmission (TETCO) · posted 2026-10-30 · effective 2026-10-07 · capacity constraint
TETCO is providing an update on the unplanned outage on Line 15 between the Tompkinsville and Danville compressor stations (Valve Sections 2-4), originally posted under Notice 183681. Primary Firm nomination restrictions remain in effect with no fixed end date; TETCO targets a re…

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, WATERFORD PLANT - WASHINGTON CO., OH (Texas Eastern Transmission (TETCO) loc 73334) scheduled quantity, gas day November 27, 2026. https://enercast.com/meter/tetco/73334/