Cottonwood Energy Company, LP - Newton Co., TX

Texas Eastern Transmission (TETCO) · Loc 73298
Power plant delivery · counted in Power Generation
Gas day Nov 27
0.130
Bcf/d scheduled
Δ Day-over-day
+0.000
vs Nov 26
7-day average
0.118
Bcf/d
30-day average
0.086
30 of 30 days posted
30-day high
0.135
Oct 30
30-day low
0.000
Oct 29
Operating capacity
0.216
Bcf/d as posted, late_0005 cycle
Utilization
60%
headroom 40%

Scheduled quantities as posted by Texas Eastern Transmission (TETCO) on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the Power Generation page.

0.000.050.100.15Oct 29Nov 3Nov 8Nov 13Nov 18Nov 23 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 270.130+0.000
Nov 260.130+0.010
Nov 250.120-0.015
Nov 240.135+0.011
Nov 230.124+0.020
Nov 220.104+0.019
Nov 210.085-0.010
Nov 200.095+0.010
Nov 190.085+0.001
Nov 180.085-0.010
Nov 170.095+0.004
Nov 160.091+0.000
Nov 150.091+0.000
Nov 140.091+0.001
Nov 130.090+0.005
Nov 120.085+0.000
Nov 110.085-0.010
Nov 100.095+0.014
Nov 90.081+0.000
Nov 80.081+0.000
Nov 70.081+0.034
Nov 60.047+0.027
Nov 50.020-0.028
Nov 40.048-0.022
Nov 30.070+0.020
Nov 20.050+0.005
Nov 10.045-0.070
Oct 310.115-0.020
Oct 300.135+0.135
Oct 290.000—
79 more days on file for this meter, back to August 11, 2026. Full meter-level history is part of Institutional (API and downloads).
Texas Eastern (TETCO)Cottonwood Energy Company, LP - Newton Co., TX

Texas Eastern (TETCO)Plant location from EIA Form 860 (plant 55358).

Recent notices on Texas Eastern Transmission (TETCO)

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Texas Eastern Transmission (TETCO) notices →

Texas Eastern Transmission (TETCO) · posted 2026-11-25 · effective 2026-11-26 · informational
Texas Eastern Transmission (TETCO) · posted 2026-11-12 · effective 2026-11-12 · informational
Texas Eastern Transmission (TETCO) · posted 2026-11-05 · effective 2026-11-07 · informational
Texas Eastern Transmission (TETCO) · posted 2026-10-30 · effective 2026-09-25 · informational
Texas Eastern Transmission (TETCO) · posted 2026-10-30 · effective 2026-10-02 · informational
Texas Eastern Transmission (TETCO) · posted 2026-10-30 · effective 2026-10-02 · capacity constraint
TETCO has declared an unplanned outage between Tompkinsville and Danville Compressor Stations on Line 15 Valve Sections 2-4, requiring an immediate pressure restriction effective Gas Day October 6, 2026. North-to-South capacity on the 30-inch system is reduced to a minimum of app…
Texas Eastern Transmission (TETCO) · posted 2026-10-30 · effective 2026-10-02 · force majeure
TETCO has declared a Force Majeure due to an unplanned outage on its 30-inch system north of Tompkinsville Compressor Station in Kentucky, affecting Line 15 Valve Sections 2-4 and also implicating Danville Compressor Station. The restoration timeline is unknown ('unclear at this …
Texas Eastern Transmission (TETCO) · posted 2026-10-30 · effective 2026-10-07 · capacity constraint
TETCO is providing an update on the unplanned outage on Line 15 between the Tompkinsville and Danville compressor stations (Valve Sections 2-4), originally posted under Notice 183681. Primary Firm nomination restrictions remain in effect with no fixed end date; TETCO targets a re…

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, Cottonwood Energy Company, LP - Newton Co., TX (Texas Eastern Transmission (TETCO) loc 73298) scheduled quantity, gas day November 27, 2026. https://enercast.com/meter/tetco/73298/