Houston Pipeline Vidor

Texas Eastern Transmission (TETCO) · Loc 73432 · Texas
Intrastate interconnect · counted in Supply / Production
Gas day Nov 26
0.037
Bcf/d scheduled
Δ Day-over-day
-0.013
vs Nov 25
7-day average
0.043
Bcf/d
30-day average
0.057
30 of 30 days posted
30-day high
0.105
Nov 3
30-day low
0.000
Nov 20
Operating capacity
0.310
Bcf/d as posted, late_0005 cycle
Utilization
12%
headroom 88%

Scheduled quantities as posted by Texas Eastern Transmission (TETCO) on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the Supply / Production page.

0.000.050.100.15Oct 28Nov 2Nov 7Nov 12Nov 17Nov 22 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 260.037-0.013
Nov 250.050-0.015
Nov 240.065+0.000
Nov 230.065+0.000
Nov 220.065+0.045
Nov 210.020+0.020
Nov 200.000-0.065
Nov 190.065+0.000
Nov 180.065+0.005
Nov 170.060+0.000
Nov 160.060+0.000
Nov 150.060+0.000
Nov 140.060+0.035
Nov 130.025+0.000
Nov 120.025+0.000
Nov 110.025+0.000
Nov 100.025+0.000
Nov 90.025+0.000
Nov 80.025+0.000
Nov 70.025+0.000
Nov 60.025-0.044
Nov 50.069-0.006
Nov 40.075-0.030
Nov 30.105+0.000
Nov 20.105+0.000
Nov 10.105+0.014
Oct 310.091+0.000
Oct 300.091-0.005
Oct 290.096+0.003
Oct 280.093—
78 more days on file for this meter, back to August 11, 2026. Full meter-level history is part of Institutional (API and downloads).
Texas Eastern (TETCO)

Texas Eastern (TETCO)State only (Texas) — the meter's exact site is not geocoded; the ring marks the state, not the point.

Recent notices on Texas Eastern Transmission (TETCO)

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Texas Eastern Transmission (TETCO) notices →

Texas Eastern Transmission (TETCO) · posted 2026-11-25 · effective 2026-11-26 · informational
Texas Eastern Transmission (TETCO) · posted 2026-11-12 · effective 2026-11-12 · informational
Texas Eastern Transmission (TETCO) · posted 2026-11-05 · effective 2026-11-07 · informational
Texas Eastern Transmission (TETCO) · posted 2026-10-30 · effective 2026-09-25 · informational
Texas Eastern Transmission (TETCO) · posted 2026-10-30 · effective 2026-10-02 · informational
Texas Eastern Transmission (TETCO) · posted 2026-10-30 · effective 2026-10-02 · capacity constraint
TETCO has declared an unplanned outage between Tompkinsville and Danville Compressor Stations on Line 15 Valve Sections 2-4, requiring an immediate pressure restriction effective Gas Day October 6, 2026. North-to-South capacity on the 30-inch system is reduced to a minimum of app…
Texas Eastern Transmission (TETCO) · posted 2026-10-30 · effective 2026-10-02 · force majeure
TETCO has declared a Force Majeure due to an unplanned outage on its 30-inch system north of Tompkinsville Compressor Station in Kentucky, affecting Line 15 Valve Sections 2-4 and also implicating Danville Compressor Station. The restoration timeline is unknown ('unclear at this …
Texas Eastern Transmission (TETCO) · posted 2026-10-30 · effective 2026-10-07 · capacity constraint
TETCO is providing an update on the unplanned outage on Line 15 between the Tompkinsville and Danville compressor stations (Valve Sections 2-4), originally posted under Notice 183681. Primary Firm nomination restrictions remain in effect with no fixed end date; TETCO targets a re…

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, Houston Pipeline Vidor (Texas Eastern Transmission (TETCO) loc 73432) scheduled quantity, gas day November 26, 2026. https://enercast.com/meter/tetco/73432/