Enercast — at the moment it matters
Home / Daily Summary / Power Generation / Meter

ROLLING HILLS GENERATING LLC - (73325)

Texas Eastern Transmission (TETCO) · Loc 73325
Power plant delivery · counted in Power Generation
Gas day Nov 27
0.031
Bcf/d scheduled
Δ Day-over-day
+0.031
vs Nov 26
7-day average
0.041
Bcf/d
30-day average
0.042
30 of 30 days posted
30-day high
0.150
Oct 29
30-day low
0.000
Nov 26
Operating capacity
0.288
Bcf/d as posted, late_0005 cycle
Utilization
11%
headroom 89%

Scheduled quantities as posted by Texas Eastern Transmission (TETCO) on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the Power Generation page.

0.000.050.100.15Oct 29Nov 3Nov 8Nov 13Nov 18Nov 23 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 270.031+0.031
Nov 260.000-0.065
Nov 250.065-0.043
Nov 240.108+0.026
Nov 230.082+0.082
Nov 220.000+0.000
Nov 210.000+0.000
Nov 200.000-0.035
Nov 190.035-0.025
Nov 180.060-0.025
Nov 170.085-0.003
Nov 160.088+0.050
Nov 150.038+0.038
Nov 140.000+0.000
Nov 130.000+0.000
Nov 120.000+0.000
Nov 110.000+0.000
Nov 100.000+0.000
Nov 90.000+0.000
Nov 80.000+0.000
Nov 70.000-0.059
Nov 60.059+0.002
Nov 50.058+0.006
Nov 40.052-0.004
Nov 30.056-0.054
Nov 20.110+0.045
Nov 10.065+0.011
Oct 310.054-0.002
Oct 300.056-0.094
Oct 290.150—
79 more days on file for this meter, back to August 11, 2026. Full meter-level history is part of Institutional (API and downloads).
Texas Eastern (TETCO)ROLLING HILLS GENERATING LLC - (73325)

Texas Eastern (TETCO)Plant location from EIA Form 860 (plant 55401).

Recent notices on Texas Eastern Transmission (TETCO)

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Texas Eastern Transmission (TETCO) notices →

Texas Eastern Transmission (TETCO) · posted 2026-11-25 · effective 2026-11-26 · informational
Texas Eastern Transmission (TETCO) · posted 2026-11-12 · effective 2026-11-12 · informational
Texas Eastern Transmission (TETCO) · posted 2026-11-05 · effective 2026-11-07 · informational
Texas Eastern Transmission (TETCO) · posted 2026-10-30 · effective 2026-09-25 · informational
Texas Eastern Transmission (TETCO) · posted 2026-10-30 · effective 2026-10-02 · informational
Texas Eastern Transmission (TETCO) · posted 2026-10-30 · effective 2026-10-02 · capacity constraint
TETCO has declared an unplanned outage between Tompkinsville and Danville Compressor Stations on Line 15 Valve Sections 2-4, requiring an immediate pressure restriction effective Gas Day October 6, 2026. North-to-South capacity on the 30-inch system is reduced to a minimum of app…
Texas Eastern Transmission (TETCO) · posted 2026-10-30 · effective 2026-10-02 · force majeure
TETCO has declared a Force Majeure due to an unplanned outage on its 30-inch system north of Tompkinsville Compressor Station in Kentucky, affecting Line 15 Valve Sections 2-4 and also implicating Danville Compressor Station. The restoration timeline is unknown ('unclear at this …
Texas Eastern Transmission (TETCO) · posted 2026-10-30 · effective 2026-10-07 · capacity constraint
TETCO is providing an update on the unplanned outage on Line 15 between the Tompkinsville and Danville compressor stations (Valve Sections 2-4), originally posted under Notice 183681. Primary Firm nomination restrictions remain in effect with no fixed end date; TETCO targets a re…

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, ROLLING HILLS GENERATING LLC - (73325) (Texas Eastern Transmission (TETCO) loc 73325) scheduled quantity, gas day November 27, 2026. https://enercast.com/meter/tetco/73325/