Enercast — at the moment it matters
Home / Daily Summary / Supply / Production / Meter

SOUTH SHORE P/L (NE&T) NUECES CO. TX

Texas Eastern Transmission (TETCO) · Loc 73310 · Texas
Intrastate interconnect · counted in Supply / Production
Gas day Nov 26
-0.014
Bcf/d scheduled
Δ Day-over-day
+0.000
vs Nov 25
7-day average
-0.011
Bcf/d
30-day average
-0.008
30 of 30 days posted
30-day high
-0.005
Nov 4
30-day low
-0.014
Nov 26
Operating capacity
0.041
Bcf/d as posted, late_0005 cycle
Utilization
34%
headroom 66%

Scheduled quantities as posted by Texas Eastern Transmission (TETCO) on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the Supply / Production page.

-0.015-0.010-0.0050.000Oct 28Nov 2Nov 7Nov 12Nov 17Nov 22 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 26-0.014+0.000
Nov 25-0.014+0.000
Nov 24-0.014-0.006
Nov 23-0.008+0.000
Nov 22-0.008+0.000
Nov 21-0.008+0.000
Nov 20-0.008+0.000
Nov 19-0.008+0.000
Nov 18-0.008+0.000
Nov 17-0.008+0.000
Nov 16-0.008+0.000
Nov 15-0.008+0.000
Nov 14-0.008+0.000
Nov 13-0.008+0.000
Nov 12-0.008+0.000
Nov 11-0.008+0.000
Nov 10-0.008+0.000
Nov 9-0.008+0.000
Nov 8-0.008+0.000
Nov 7-0.008+0.000
Nov 6-0.008+0.000
Nov 5-0.008-0.003
Nov 4-0.005+0.003
Nov 3-0.008+0.000
Nov 2-0.008+0.000
Nov 1-0.008-0.003
Oct 31-0.005+0.000
Oct 30-0.005+0.000
Oct 29-0.005+0.000
Oct 28-0.005—
78 more days on file for this meter, back to August 11, 2026. Full meter-level history is part of Institutional (API and downloads).
Texas Eastern (TETCO)

Texas Eastern (TETCO)State only (Texas) — the meter's exact site is not geocoded; the ring marks the state, not the point.

Recent notices on Texas Eastern Transmission (TETCO)

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Texas Eastern Transmission (TETCO) notices →

Texas Eastern Transmission (TETCO) · posted 2026-11-25 · effective 2026-11-26 · informational
Texas Eastern Transmission (TETCO) · posted 2026-11-12 · effective 2026-11-12 · informational
Texas Eastern Transmission (TETCO) · posted 2026-11-05 · effective 2026-11-07 · informational
Texas Eastern Transmission (TETCO) · posted 2026-10-30 · effective 2026-09-25 · informational
Texas Eastern Transmission (TETCO) · posted 2026-10-30 · effective 2026-10-02 · informational
Texas Eastern Transmission (TETCO) · posted 2026-10-30 · effective 2026-10-02 · capacity constraint
TETCO has declared an unplanned outage between Tompkinsville and Danville Compressor Stations on Line 15 Valve Sections 2-4, requiring an immediate pressure restriction effective Gas Day October 6, 2026. North-to-South capacity on the 30-inch system is reduced to a minimum of app…
Texas Eastern Transmission (TETCO) · posted 2026-10-30 · effective 2026-10-02 · force majeure
TETCO has declared a Force Majeure due to an unplanned outage on its 30-inch system north of Tompkinsville Compressor Station in Kentucky, affecting Line 15 Valve Sections 2-4 and also implicating Danville Compressor Station. The restoration timeline is unknown ('unclear at this …
Texas Eastern Transmission (TETCO) · posted 2026-10-30 · effective 2026-10-07 · capacity constraint
TETCO is providing an update on the unplanned outage on Line 15 between the Tompkinsville and Danville compressor stations (Valve Sections 2-4), originally posted under Notice 183681. Primary Firm nomination restrictions remain in effect with no fixed end date; TETCO targets a re…

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, SOUTH SHORE P/L (NE&T) NUECES CO. TX (Texas Eastern Transmission (TETCO) loc 73310) scheduled quantity, gas day November 26, 2026. https://enercast.com/meter/tetco/73310/