Enercast — at the moment it matters
Home / Daily Summary / Power Generation / Meter

Duke Energy Kentucky

Texas Eastern Transmission (TETCO) · Loc 73280
Power plant delivery · counted in Power Generation
Gas day Nov 27
0.000
Bcf/d scheduled
Δ Day-over-day
+0.000
vs Nov 26
7-day average
0.016
Bcf/d
30-day average
0.026
30 of 30 days posted
30-day high
0.120
Nov 19
30-day low
0.000
Nov 27
Operating capacity
0.176
Bcf/d as posted, late_0005 cycle
Utilization
0%
headroom 100%

Scheduled quantities as posted by Texas Eastern Transmission (TETCO) on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the Power Generation page.

0.000.050.100.15Oct 29Nov 3Nov 8Nov 13Nov 18Nov 23 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 270.000+0.000
Nov 260.000+0.000
Nov 250.000+0.000
Nov 240.000-0.020
Nov 230.020-0.025
Nov 220.045-0.005
Nov 210.050-0.010
Nov 200.060-0.060
Nov 190.120+0.044
Nov 180.076+0.041
Nov 170.035+0.005
Nov 160.030+0.000
Nov 150.030+0.010
Nov 140.020-0.010
Nov 130.030+0.019
Nov 120.011+0.006
Nov 110.005+0.005
Nov 100.000+0.000
Nov 90.000-0.008
Nov 80.008-0.007
Nov 70.015+0.000
Nov 60.015-0.020
Nov 50.035+0.000
Nov 40.035+0.013
Nov 30.022+0.001
Nov 20.021+0.021
Nov 10.000+0.000
Oct 310.000-0.010
Oct 300.010-0.070
Oct 290.080—
79 more days on file for this meter, back to August 11, 2026. Full meter-level history is part of Institutional (API and downloads).
Texas Eastern (TETCO)Duke Energy Kentucky

Texas Eastern (TETCO)Placed at the center of Butler, OH — approximate; the exact meter site is not published.

Recent notices on Texas Eastern Transmission (TETCO)

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Texas Eastern Transmission (TETCO) notices →

Texas Eastern Transmission (TETCO) · posted 2026-11-25 · effective 2026-11-26 · informational
Texas Eastern Transmission (TETCO) · posted 2026-11-12 · effective 2026-11-12 · informational
Texas Eastern Transmission (TETCO) · posted 2026-11-05 · effective 2026-11-07 · informational
Texas Eastern Transmission (TETCO) · posted 2026-10-30 · effective 2026-09-25 · informational
Texas Eastern Transmission (TETCO) · posted 2026-10-30 · effective 2026-10-02 · informational
Texas Eastern Transmission (TETCO) · posted 2026-10-30 · effective 2026-10-02 · capacity constraint
TETCO has declared an unplanned outage between Tompkinsville and Danville Compressor Stations on Line 15 Valve Sections 2-4, requiring an immediate pressure restriction effective Gas Day October 6, 2026. North-to-South capacity on the 30-inch system is reduced to a minimum of app…
Texas Eastern Transmission (TETCO) · posted 2026-10-30 · effective 2026-10-02 · force majeure
TETCO has declared a Force Majeure due to an unplanned outage on its 30-inch system north of Tompkinsville Compressor Station in Kentucky, affecting Line 15 Valve Sections 2-4 and also implicating Danville Compressor Station. The restoration timeline is unknown ('unclear at this …
Texas Eastern Transmission (TETCO) · posted 2026-10-30 · effective 2026-10-07 · capacity constraint
TETCO is providing an update on the unplanned outage on Line 15 between the Tompkinsville and Danville compressor stations (Valve Sections 2-4), originally posted under Notice 183681. Primary Firm nomination restrictions remain in effect with no fixed end date; TETCO targets a re…

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, Duke Energy Kentucky (Texas Eastern Transmission (TETCO) loc 73280) scheduled quantity, gas day November 27, 2026. https://enercast.com/meter/tetco/73280/