Enercast — at the moment it matters
Home / Daily Summary / Supply / Production / Meter

ENTERPRISE TEXAS PIPELINE LLC - HIDALGO COUNTY TX

Texas Eastern Transmission (TETCO) · Loc 73113 · Texas
Intrastate interconnect · counted in Supply / Production
Gas day Nov 26
0.034
Bcf/d scheduled
Δ Day-over-day
-0.012
vs Nov 25
7-day average
0.057
Bcf/d
30-day average
0.043
30 of 30 days posted
30-day high
0.107
Nov 21
30-day low
0.000
Nov 3
Operating capacity
0.102
Bcf/d as posted, late_0005 cycle
Utilization
34%
headroom 66%

Scheduled quantities as posted by Texas Eastern Transmission (TETCO) on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the Supply / Production page.

0.000.050.100.15Oct 28Nov 2Nov 7Nov 12Nov 17Nov 22 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 260.034-0.012
Nov 250.046+0.000
Nov 240.046-0.010
Nov 230.056+0.000
Nov 220.056-0.051
Nov 210.107+0.051
Nov 200.056+0.010
Nov 190.046+0.000
Nov 180.046-0.001
Nov 170.047-0.019
Nov 160.066-0.025
Nov 150.091+0.025
Nov 140.066+0.019
Nov 130.047+0.017
Nov 120.029-0.036
Nov 110.065+0.036
Nov 100.029+0.000
Nov 90.029+0.000
Nov 80.029+0.000
Nov 70.029+0.000
Nov 60.029+0.029
Nov 50.000+0.000
Nov 40.000+0.000
Nov 30.000+0.000
Nov 20.000-0.035
Nov 10.035-0.015
Oct 310.050+0.000
Oct 300.050+0.008
Oct 290.042-0.010
Oct 280.051—
78 more days on file for this meter, back to August 11, 2026. Full meter-level history is part of Institutional (API and downloads).
Texas Eastern (TETCO)

Texas Eastern (TETCO)State only (Texas) — the meter's exact site is not geocoded; the ring marks the state, not the point.

Recent notices on Texas Eastern Transmission (TETCO)

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Texas Eastern Transmission (TETCO) notices →

Texas Eastern Transmission (TETCO) · posted 2026-11-25 · effective 2026-11-26 · informational
Texas Eastern Transmission (TETCO) · posted 2026-11-12 · effective 2026-11-12 · informational
Texas Eastern Transmission (TETCO) · posted 2026-11-05 · effective 2026-11-07 · informational
Texas Eastern Transmission (TETCO) · posted 2026-10-30 · effective 2026-09-25 · informational
Texas Eastern Transmission (TETCO) · posted 2026-10-30 · effective 2026-10-02 · informational
Texas Eastern Transmission (TETCO) · posted 2026-10-30 · effective 2026-10-02 · capacity constraint
TETCO has declared an unplanned outage between Tompkinsville and Danville Compressor Stations on Line 15 Valve Sections 2-4, requiring an immediate pressure restriction effective Gas Day October 6, 2026. North-to-South capacity on the 30-inch system is reduced to a minimum of app…
Texas Eastern Transmission (TETCO) · posted 2026-10-30 · effective 2026-10-02 · force majeure
TETCO has declared a Force Majeure due to an unplanned outage on its 30-inch system north of Tompkinsville Compressor Station in Kentucky, affecting Line 15 Valve Sections 2-4 and also implicating Danville Compressor Station. The restoration timeline is unknown ('unclear at this …
Texas Eastern Transmission (TETCO) · posted 2026-10-30 · effective 2026-10-07 · capacity constraint
TETCO is providing an update on the unplanned outage on Line 15 between the Tompkinsville and Danville compressor stations (Valve Sections 2-4), originally posted under Notice 183681. Primary Firm nomination restrictions remain in effect with no fixed end date; TETCO targets a re…

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, ENTERPRISE TEXAS PIPELINE LLC - HIDALGO COUNTY TX (Texas Eastern Transmission (TETCO) loc 73113) scheduled quantity, gas day November 26, 2026. https://enercast.com/meter/tetco/73113/