Enercast — at the moment it matters
Home / Daily Summary / Supply / Production / Meter

DENBURY ONSHORE LLC

Texas Eastern Transmission (TETCO) · Loc 72877 · Texas
Processing plant · counted in Supply / Production
Gas day Nov 26
-0.000
Bcf/d scheduled
Δ Day-over-day
+0.000
vs Nov 25
7-day average
-0.001
Bcf/d
30-day average
-0.001
30 of 30 days posted
30-day high
-0.000
Nov 26
30-day low
-0.002
Nov 23
Operating capacity
0.016
Bcf/d as posted, late_0005 cycle
Utilization
1%
headroom 99%

Scheduled quantities as posted by Texas Eastern Transmission (TETCO) on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the Supply / Production page.

-0.002-0.001-0.0010.000Oct 28Nov 2Nov 7Nov 12Nov 17Nov 22 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 26-0.000+0.000
Nov 25-0.001+0.000
Nov 24-0.001+0.001
Nov 23-0.002+0.000
Nov 22-0.002+0.000
Nov 21-0.002-0.000
Nov 20-0.001+0.000
Nov 19-0.001-0.001
Nov 18-0.001+0.000
Nov 17-0.001+0.000
Nov 16-0.001+0.000
Nov 15-0.001+0.000
Nov 14-0.001+0.001
Nov 13-0.001+0.000
Nov 12-0.001+0.000
Nov 11-0.001+0.000
Nov 10-0.001-0.000
Nov 9-0.001+0.000
Nov 8-0.001+0.000
Nov 7-0.001+0.000
Nov 6-0.001+0.000
Nov 5-0.001-0.000
Nov 4-0.001+0.000
Nov 3-0.001-0.000
Nov 2-0.001+0.000
Nov 1-0.001-0.000
Oct 31-0.001+0.000
Oct 30-0.001+0.000
Oct 29-0.001+0.000
Oct 28-0.001—
78 more days on file for this meter, back to August 11, 2026. Full meter-level history is part of Institutional (API and downloads).
Texas Eastern (TETCO)

Texas Eastern (TETCO)State only (Texas) — the meter's exact site is not geocoded; the ring marks the state, not the point.

Recent notices on Texas Eastern Transmission (TETCO)

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Texas Eastern Transmission (TETCO) notices →

Texas Eastern Transmission (TETCO) · posted 2026-11-25 · effective 2026-11-26 · informational
Texas Eastern Transmission (TETCO) · posted 2026-11-12 · effective 2026-11-12 · informational
Texas Eastern Transmission (TETCO) · posted 2026-11-05 · effective 2026-11-07 · informational
Texas Eastern Transmission (TETCO) · posted 2026-10-30 · effective 2026-09-25 · informational
Texas Eastern Transmission (TETCO) · posted 2026-10-30 · effective 2026-10-02 · informational
Texas Eastern Transmission (TETCO) · posted 2026-10-30 · effective 2026-10-02 · capacity constraint
TETCO has declared an unplanned outage between Tompkinsville and Danville Compressor Stations on Line 15 Valve Sections 2-4, requiring an immediate pressure restriction effective Gas Day October 6, 2026. North-to-South capacity on the 30-inch system is reduced to a minimum of app…
Texas Eastern Transmission (TETCO) · posted 2026-10-30 · effective 2026-10-02 · force majeure
TETCO has declared a Force Majeure due to an unplanned outage on its 30-inch system north of Tompkinsville Compressor Station in Kentucky, affecting Line 15 Valve Sections 2-4 and also implicating Danville Compressor Station. The restoration timeline is unknown ('unclear at this …
Texas Eastern Transmission (TETCO) · posted 2026-10-30 · effective 2026-10-07 · capacity constraint
TETCO is providing an update on the unplanned outage on Line 15 between the Tompkinsville and Danville compressor stations (Valve Sections 2-4), originally posted under Notice 183681. Primary Firm nomination restrictions remain in effect with no fixed end date; TETCO targets a re…

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, DENBURY ONSHORE LLC (Texas Eastern Transmission (TETCO) loc 72877) scheduled quantity, gas day November 26, 2026. https://enercast.com/meter/tetco/72877/