Enercast — at the moment it matters
Home / Daily Summary / Power Generation / Meter

Entergy Louisiana,LLC Beauregard Psh., LA

Texas Eastern Transmission (TETCO) · Loc 72604
Power plant delivery · counted in Power Generation
Gas day Nov 27
0.085
Bcf/d scheduled
Δ Day-over-day
+0.000
vs Nov 26
7-day average
0.085
Bcf/d
30-day average
0.057
30 of 30 days posted
30-day high
0.085
Nov 27
30-day low
0.000
Nov 5
Operating capacity
0.187
Bcf/d as posted, late_0005 cycle
Utilization
45%
headroom 55%

Scheduled quantities as posted by Texas Eastern Transmission (TETCO) on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the Power Generation page.

0.0000.0250.0500.0750.100Oct 29Nov 3Nov 8Nov 13Nov 18Nov 23 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 270.085+0.000
Nov 260.085+0.000
Nov 250.085+0.000
Nov 240.085+0.000
Nov 230.085+0.000
Nov 220.085+0.000
Nov 210.085+0.000
Nov 200.085+0.000
Nov 190.085+0.000
Nov 180.085+0.000
Nov 170.085+0.000
Nov 160.085+0.000
Nov 150.085+0.000
Nov 140.085+0.000
Nov 130.085+0.005
Nov 120.080+0.000
Nov 110.080+0.015
Nov 100.065+0.015
Nov 90.050+0.000
Nov 80.050+0.000
Nov 70.050+0.000
Nov 60.050+0.050
Nov 50.000-0.025
Nov 40.025+0.025
Nov 30.000+0.000
Nov 20.000+0.000
Nov 10.000+0.000
Oct 310.000+0.000
Oct 300.000+0.000
Oct 290.000—
79 more days on file for this meter, back to August 11, 2026. Full meter-level history is part of Institutional (API and downloads).
Texas Eastern (TETCO)

Texas Eastern (TETCO)Exact site not geocoded — the highlighted line is the pipeline system this meter sits on.

Notices that name this point

Text match on the meter’s name or location ID in the notice — last 90 days. A text match is a pointer, not a confirmed capacity impact at this meter.

Texas Eastern Transmission (TETCO) · posted 2026-10-30 · effective 2026-10-20 · informational
Recent notices on Texas Eastern Transmission (TETCO)

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Texas Eastern Transmission (TETCO) notices →

Texas Eastern Transmission (TETCO) · posted 2026-11-25 · effective 2026-11-26 · informational
Texas Eastern Transmission (TETCO) · posted 2026-11-12 · effective 2026-11-12 · informational
Texas Eastern Transmission (TETCO) · posted 2026-11-05 · effective 2026-11-07 · informational
Texas Eastern Transmission (TETCO) · posted 2026-10-30 · effective 2026-09-25 · informational
Texas Eastern Transmission (TETCO) · posted 2026-10-30 · effective 2026-10-02 · informational
Texas Eastern Transmission (TETCO) · posted 2026-10-30 · effective 2026-10-02 · capacity constraint
TETCO has declared an unplanned outage between Tompkinsville and Danville Compressor Stations on Line 15 Valve Sections 2-4, requiring an immediate pressure restriction effective Gas Day October 6, 2026. North-to-South capacity on the 30-inch system is reduced to a minimum of app…
Texas Eastern Transmission (TETCO) · posted 2026-10-30 · effective 2026-10-02 · force majeure
TETCO has declared a Force Majeure due to an unplanned outage on its 30-inch system north of Tompkinsville Compressor Station in Kentucky, affecting Line 15 Valve Sections 2-4 and also implicating Danville Compressor Station. The restoration timeline is unknown ('unclear at this …
Texas Eastern Transmission (TETCO) · posted 2026-10-30 · effective 2026-10-07 · capacity constraint
TETCO is providing an update on the unplanned outage on Line 15 between the Tompkinsville and Danville compressor stations (Valve Sections 2-4), originally posted under Notice 183681. Primary Firm nomination restrictions remain in effect with no fixed end date; TETCO targets a re…

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, Entergy Louisiana,LLC Beauregard Psh., LA (Texas Eastern Transmission (TETCO) loc 72604) scheduled quantity, gas day November 27, 2026. https://enercast.com/meter/tetco/72604/