Enercast — at the moment it matters
Home / Daily Summary / Power Generation / Meter

Entergy Sabine Power Station - Orange Co., TX

Texas Eastern Transmission (TETCO) · Loc 72395
Power plant delivery · counted in Power Generation
Gas day Nov 27
0.060
Bcf/d scheduled
Δ Day-over-day
+0.000
vs Nov 26
7-day average
0.068
Bcf/d
30-day average
0.057
30 of 30 days posted
30-day high
0.079
Nov 24
30-day low
0.030
Nov 5
Operating capacity
0.126
Bcf/d as posted, late_0005 cycle
Utilization
48%
headroom 52%

Scheduled quantities as posted by Texas Eastern Transmission (TETCO) on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the Power Generation page.

0.0000.0200.0400.0600.080Oct 29Nov 3Nov 8Nov 13Nov 18Nov 23 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 270.060+0.000
Nov 260.060-0.010
Nov 250.070-0.009
Nov 240.079+0.009
Nov 230.070+0.000
Nov 220.070+0.000
Nov 210.070+0.000
Nov 200.070+0.005
Nov 190.065+0.010
Nov 180.055-0.010
Nov 170.065+0.015
Nov 160.050+0.000
Nov 150.050+0.000
Nov 140.050+0.000
Nov 130.050+0.000
Nov 120.050+0.000
Nov 110.050+0.015
Nov 100.035-0.026
Nov 90.061+0.026
Nov 80.035+0.000
Nov 70.035-0.030
Nov 60.065+0.035
Nov 50.030-0.020
Nov 40.050+0.000
Nov 30.050-0.020
Nov 20.070+0.000
Nov 10.070+0.005
Oct 310.065+0.000
Oct 300.065+0.015
Oct 290.050—
79 more days on file for this meter, back to August 11, 2026. Full meter-level history is part of Institutional (API and downloads).
Texas Eastern (TETCO)Entergy Sabine Power Station - Orange Co., TX

Texas Eastern (TETCO)Plant location from EIA Form 860 (plant 3459).

Recent notices on Texas Eastern Transmission (TETCO)

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Texas Eastern Transmission (TETCO) notices →

Texas Eastern Transmission (TETCO) · posted 2026-11-25 · effective 2026-11-26 · informational
Texas Eastern Transmission (TETCO) · posted 2026-11-12 · effective 2026-11-12 · informational
Texas Eastern Transmission (TETCO) · posted 2026-11-05 · effective 2026-11-07 · informational
Texas Eastern Transmission (TETCO) · posted 2026-10-30 · effective 2026-09-25 · informational
Texas Eastern Transmission (TETCO) · posted 2026-10-30 · effective 2026-10-02 · informational
Texas Eastern Transmission (TETCO) · posted 2026-10-30 · effective 2026-10-02 · capacity constraint
TETCO has declared an unplanned outage between Tompkinsville and Danville Compressor Stations on Line 15 Valve Sections 2-4, requiring an immediate pressure restriction effective Gas Day October 6, 2026. North-to-South capacity on the 30-inch system is reduced to a minimum of app…
Texas Eastern Transmission (TETCO) · posted 2026-10-30 · effective 2026-10-02 · force majeure
TETCO has declared a Force Majeure due to an unplanned outage on its 30-inch system north of Tompkinsville Compressor Station in Kentucky, affecting Line 15 Valve Sections 2-4 and also implicating Danville Compressor Station. The restoration timeline is unknown ('unclear at this …
Texas Eastern Transmission (TETCO) · posted 2026-10-30 · effective 2026-10-07 · capacity constraint
TETCO is providing an update on the unplanned outage on Line 15 between the Tompkinsville and Danville compressor stations (Valve Sections 2-4), originally posted under Notice 183681. Primary Firm nomination restrictions remain in effect with no fixed end date; TETCO targets a re…

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, Entergy Sabine Power Station - Orange Co., TX (Texas Eastern Transmission (TETCO) loc 72395) scheduled quantity, gas day November 27, 2026. https://enercast.com/meter/tetco/72395/