Enercast — at the moment it matters
Home / Daily Summary / Power Generation / Meter

Nine Mile Power Plt (To Lp&L) (Entergy Louisiana LLC)

Gulf South Pipeline · Loc 73 · Jefferson Parish, LA
Power plant delivery · counted in Power Generation · owner Entergy Louisiana LLC
Gas day Nov 26
0.110
Bcf/d scheduled
Δ Day-over-day
-0.005
vs Nov 25
7-day average
0.123
Bcf/d
30-day average
0.124
30 of 30 days posted
30-day high
0.166
Nov 2
30-day low
0.103
Oct 31
Operating capacity
0.222
Bcf/d as posted, eve cycle
Utilization
50%
headroom 50%

Scheduled quantities as posted by Gulf South Pipeline on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the Power Generation page.

0.000.050.100.150.20Oct 28Nov 2Nov 7Nov 12Nov 17Nov 22 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 260.110-0.005
Nov 250.115+0.004
Nov 240.111-0.019
Nov 230.130-0.001
Nov 220.131-0.001
Nov 210.132+0.002
Nov 200.130-0.003
Nov 190.133+0.000
Nov 180.133+0.005
Nov 170.127+0.001
Nov 160.126+0.000
Nov 150.126+0.001
Nov 140.125+0.001
Nov 130.124+0.002
Nov 120.122-0.000
Nov 110.123+0.006
Nov 100.117-0.005
Nov 90.121+0.000
Nov 80.121+0.004
Nov 70.117+0.003
Nov 60.114-0.016
Nov 50.130-0.006
Nov 40.136-0.004
Nov 30.140-0.026
Nov 20.166+0.027
Nov 10.139+0.036
Oct 310.103-0.002
Oct 300.105-0.014
Oct 290.119+0.015
Oct 280.104—
82 more days on file for this meter, back to August 7, 2026. Full meter-level history is part of Institutional (API and downloads).
Gulf South PipelineNine Mile Power Plt (To Lp&L) (Entergy Louisiana LLC)

Gulf South PipelinePlant location from EIA Form 860 (plant 1403).

Recent notices on Gulf South Pipeline

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Gulf South Pipeline notices →

Gulf South Pipeline · posted 2026-11-19 · effective 2026-11-20 · informational
Gulf South Pipeline · posted 2026-11-06 · effective 2026-11-06 · informational
Gulf South Pipeline · posted 2026-10-27 · effective 2026-10-27 · operational alert
Gulf South Pipeline has extended its System Management Plan at Location 24329 Stratton Ridge (to Freeport LNG) for a second consecutive day, effective 10/27/2026 08:00 AM through 10/28/2026 09:00 AM. The SMP is triggered by Freeport LNG's continued failure to take confirmed quant…

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, Nine Mile Power Plt (To Lp&L) (Entergy Louisiana LLC) (Gulf South Pipeline loc 73) scheduled quantity, gas day November 26, 2026. https://enercast.com/meter/gulfsouth/73/