Enercast — at the moment it matters
Home / Daily Summary / Power Generation / Meter

Lake Charles Power Station (Entergy Louisiana LLC)

Gulf South Pipeline · Loc 24439 · Calcasieu Parish, LA
Power plant delivery · counted in Power Generation · owner Entergy Louisiana LLC
Gas day Nov 27
0.144
Bcf/d scheduled
Δ Day-over-day
+0.000
vs Nov 26
7-day average
0.149
Bcf/d
30-day average
0.097
30 of 30 days posted
30-day high
0.164
Nov 19
30-day low
0.000
Nov 3
Operating capacity
0.318
Bcf/d as posted, eve cycle
Utilization
45%
headroom 55%

Scheduled quantities as posted by Gulf South Pipeline on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the Power Generation page.

0.000.050.100.150.20Oct 29Nov 3Nov 8Nov 13Nov 18Nov 23 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 270.144+0.000
Nov 260.144+0.000
Nov 250.144+0.000
Nov 240.144-0.012
Nov 230.156+0.000
Nov 220.156+0.000
Nov 210.156+0.000
Nov 200.156-0.008
Nov 190.164+0.005
Nov 180.159+0.001
Nov 170.158+0.015
Nov 160.144-0.000
Nov 150.144-0.011
Nov 140.155+0.007
Nov 130.148+0.009
Nov 120.139+0.000
Nov 110.139+0.074
Nov 100.064+0.015
Nov 90.050+0.000
Nov 80.050+0.000
Nov 70.050+0.000
Nov 60.050+0.007
Nov 50.043-0.002
Nov 40.045+0.045
Nov 30.000+0.000
Nov 20.000+0.000
Nov 10.000+0.000
Oct 310.000+0.000
Oct 300.000+0.000
Oct 290.000—
83 more days on file for this meter, back to August 7, 2026. Full meter-level history is part of Institutional (API and downloads).
Gulf South PipelineLake Charles Power Station (Entergy Louisiana LLC)

Gulf South PipelinePlant location from EIA Form 860 (plant 58310).

Recent notices on Gulf South Pipeline

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Gulf South Pipeline notices →

Gulf South Pipeline · posted 2026-11-19 · effective 2026-11-20 · informational
Gulf South Pipeline · posted 2026-11-06 · effective 2026-11-06 · informational

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, Lake Charles Power Station (Entergy Louisiana LLC) (Gulf South Pipeline loc 24439) scheduled quantity, gas day November 27, 2026. https://enercast.com/meter/gulfsouth/24439/