Enercast — at the moment it matters
Home / Daily Summary / Power Generation / Meter

Plant Morrow - Cooperative Energy (Cooperative Energy)

Gulf South Pipeline · Loc 24529 · Lamar County, MS
Power plant delivery · counted in Power Generation · owner Cooperative Energy
Gas day Nov 27
0.090
Bcf/d scheduled
Δ Day-over-day
+0.050
vs Nov 26
7-day average
0.066
Bcf/d
30-day average
0.057
30 of 30 days posted
30-day high
0.090
Nov 27
30-day low
0.010
Nov 12
Operating capacity
0.250
Bcf/d as posted, eve cycle
Utilization
36%
headroom 64%

Scheduled quantities as posted by Gulf South Pipeline on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the Power Generation page.

0.0000.0250.0500.0750.100Oct 29Nov 3Nov 8Nov 13Nov 18Nov 23 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 270.090+0.050
Nov 260.040+0.000
Nov 250.040-0.048
Nov 240.088-0.002
Nov 230.090+0.020
Nov 220.070+0.025
Nov 210.045-0.025
Nov 200.070+0.005
Nov 190.065+0.005
Nov 180.060+0.015
Nov 170.045+0.017
Nov 160.028+0.000
Nov 150.028+0.000
Nov 140.028+0.004
Nov 130.024+0.014
Nov 120.010-0.005
Nov 110.015-0.005
Nov 100.020-0.010
Nov 90.030+0.008
Nov 80.022-0.043
Nov 70.065-0.025
Nov 60.090+0.005
Nov 50.085-0.005
Nov 40.090+0.000
Nov 30.090+0.000
Nov 20.090+0.000
Nov 10.090+0.015
Oct 310.075+0.000
Oct 300.075+0.010
Oct 290.065—
83 more days on file for this meter, back to August 7, 2026. Full meter-level history is part of Institutional (API and downloads).
Gulf South PipelinePlant Morrow - Cooperative Energy (Cooperative Energy)

Gulf South PipelinePlant location from EIA Form 860 (plant 6061).

Recent notices on Gulf South Pipeline

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Gulf South Pipeline notices →

Gulf South Pipeline · posted 2026-11-19 · effective 2026-11-20 · informational
Gulf South Pipeline · posted 2026-11-06 · effective 2026-11-06 · informational

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, Plant Morrow - Cooperative Energy (Cooperative Energy) (Gulf South Pipeline loc 24529) scheduled quantity, gas day November 27, 2026. https://enercast.com/meter/gulfsouth/24529/