Gas day Nov 27
0.080
Bcf/d scheduled
Δ Day-over-day
+0.000
vs Nov 26
7-day average
0.080
Bcf/d
30-day average
0.048
30 of 30 days posted
30-day high
0.080
Nov 27
30-day low
0.000
Nov 15
Operating capacity
0.120
Bcf/d as posted, eve cycle
Utilization
66%
headroom 34%

Scheduled quantities as posted by Gulf South Pipeline on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the Power Generation page.

0.0000.0200.0400.0600.080Oct 29Nov 3Nov 8Nov 13Nov 18Nov 23 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 270.080+0.000
Nov 260.080+0.000
Nov 250.080+0.000
Nov 240.080+0.000
Nov 230.080+0.000
Nov 220.080+0.000
Nov 210.080+0.000
Nov 200.080+0.000
Nov 190.080+0.000
Nov 180.080+0.000
Nov 170.080+0.065
Nov 160.015+0.015
Nov 150.000+0.000
Nov 140.000-0.017
Nov 130.017-0.023
Nov 120.040+0.023
Nov 110.016-0.061
Nov 100.077+0.077
Nov 90.000+0.000
Nov 80.000+0.000
Nov 70.000+0.000
Nov 60.000+0.000
Nov 50.000+0.000
Nov 40.000-0.001
Nov 30.001-0.077
Nov 20.078+0.005
Nov 10.072-0.007
Oct 310.080+0.000
Oct 300.080+0.000
Oct 290.080—
83 more days on file for this meter, back to August 7, 2026. Full meter-level history is part of Institutional (API and downloads).
Gulf South PipelineNextera (Lowman) Choctaw County

Gulf South PipelinePlaced at the center of Choctaw, AL — approximate; the exact meter site is not published.

Recent notices on Gulf South Pipeline

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Gulf South Pipeline notices →

Gulf South Pipeline · posted 2026-11-19 · effective 2026-11-20 · informational
Gulf South Pipeline · posted 2026-11-06 · effective 2026-11-06 · informational

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, Nextera (Lowman) Choctaw County (Gulf South Pipeline loc 24504) scheduled quantity, gas day November 27, 2026. https://enercast.com/meter/gulfsouth/24504/