Gas day Nov 27
0.129
Bcf/d scheduled
Δ Day-over-day
-0.006
vs Nov 26
7-day average
0.144
Bcf/d
30-day average
0.148
30 of 30 days posted
30-day high
0.177
Oct 31
30-day low
0.129
Nov 27
Operating capacity
0.302
Bcf/d as posted, eve cycle
Utilization
43%
headroom 57%

Scheduled quantities as posted by Gulf South Pipeline on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the Power Generation page.

0.000.050.100.150.20Oct 29Nov 3Nov 8Nov 13Nov 18Nov 23 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 270.129-0.006
Nov 260.135-0.025
Nov 250.160-0.009
Nov 240.169+0.030
Nov 230.140+0.000
Nov 220.140+0.004
Nov 210.135+0.000
Nov 200.135-0.020
Nov 190.155+0.021
Nov 180.134-0.015
Nov 170.149-0.005
Nov 160.154+0.000
Nov 150.154+0.014
Nov 140.140+0.011
Nov 130.129-0.013
Nov 120.143-0.016
Nov 110.159+0.015
Nov 100.144-0.005
Nov 90.148+0.000
Nov 80.148-0.005
Nov 70.153+0.017
Nov 60.136-0.008
Nov 50.144+0.006
Nov 40.138-0.023
Nov 30.161+0.016
Nov 20.145+0.000
Nov 10.145-0.032
Oct 310.177+0.000
Oct 300.177+0.023
Oct 290.154—
83 more days on file for this meter, back to August 7, 2026. Full meter-level history is part of Institutional (API and downloads).
Gulf South PipelineColorado Bend Plant (State Hwy 60) (CER Colorado Bend Energy Partners LP)

Gulf South PipelinePlaced at the center of Wharton County, TX — approximate; the exact meter site is not published.

Recent notices on Gulf South Pipeline

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Gulf South Pipeline notices →

Gulf South Pipeline · posted 2026-11-19 · effective 2026-11-20 · informational
Gulf South Pipeline · posted 2026-11-06 · effective 2026-11-06 · informational

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, Colorado Bend Plant (State Hwy 60) (CER Colorado Bend Energy Partners LP) (Gulf South Pipeline loc 24287) scheduled quantity, gas day November 27, 2026. https://enercast.com/meter/gulfsouth/24287/