Rayburn Energy Station (South Texas Electric Coop Inc)

Gulf South Pipeline · Loc 23074 · Victoria County, TX
Power plant delivery · counted in Power Generation · owner South Texas Electric Coop Inc
Gas day Nov 26
0.095
Bcf/d scheduled
Δ Day-over-day
-0.015
vs Nov 25
7-day average
0.074
Bcf/d
30-day average
0.088
30 of 30 days posted
30-day high
0.120
Nov 12
30-day low
0.000
Nov 20
Operating capacity
0.230
Bcf/d as posted, eve cycle
Utilization
41%
headroom 59%

Scheduled quantities as posted by Gulf South Pipeline on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the Power Generation page.

0.000.050.100.15Oct 28Nov 2Nov 7Nov 12Nov 17Nov 22 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 260.095-0.015
Nov 250.110+0.005
Nov 240.105+0.000
Nov 230.105+0.030
Nov 220.075+0.050
Nov 210.025+0.025
Nov 200.000+0.000
Nov 190.000+0.000
Nov 180.000-0.080
Nov 170.080-0.025
Nov 160.105+0.000
Nov 150.105+0.105
Nov 140.000-0.070
Nov 130.070-0.050
Nov 120.120+0.000
Nov 110.120+0.005
Nov 100.115+0.010
Nov 90.105+0.000
Nov 80.105+0.000
Nov 70.105+0.005
Nov 60.100-0.005
Nov 50.105+0.000
Nov 40.105+0.000
Nov 30.105-0.010
Nov 20.115+0.000
Nov 10.115-0.005
Oct 310.120+0.000
Oct 300.120+0.005
Oct 290.115+0.015
Oct 280.100—
82 more days on file for this meter, back to August 7, 2026. Full meter-level history is part of Institutional (API and downloads).
Gulf South PipelineRayburn Energy Station (South Texas Electric Coop Inc)

Gulf South PipelinePlaced at the center of Victoria County, TX — approximate; the exact meter site is not published.

Recent notices on Gulf South Pipeline

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Gulf South Pipeline notices →

Gulf South Pipeline · posted 2026-11-19 · effective 2026-11-20 · informational
Gulf South Pipeline · posted 2026-11-06 · effective 2026-11-06 · informational
Gulf South Pipeline · posted 2026-10-27 · effective 2026-10-27 · operational alert
Gulf South Pipeline has extended its System Management Plan at Location 24329 Stratton Ridge (to Freeport LNG) for a second consecutive day, effective 10/27/2026 08:00 AM through 10/28/2026 09:00 AM. The SMP is triggered by Freeport LNG's continued failure to take confirmed quant…

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, Rayburn Energy Station (South Texas Electric Coop Inc) (Gulf South Pipeline loc 23074) scheduled quantity, gas day November 26, 2026. https://enercast.com/meter/gulfsouth/23074/