Gas day Nov 26
0.157
Bcf/d scheduled
Δ Day-over-day
+0.014
vs Nov 25
7-day average
0.142
Bcf/d
30-day average
0.143
30 of 30 days posted
30-day high
0.178
Nov 2
30-day low
0.099
Oct 31
Operating capacity
0.249
Bcf/d as posted, eve cycle
Utilization
63%
headroom 37%
Scheduled quantities as posted by Gulf South Pipeline on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the Power Generation page.
Last 30 Gas Days
Show the 30-day table
| Gas day | Bcf/d | Δ DoD |
|---|---|---|
| Nov 26 | 0.157 | +0.014 |
| Nov 25 | 0.143 | +0.009 |
| Nov 24 | 0.133 | -0.011 |
| Nov 23 | 0.145 | -0.001 |
| Nov 22 | 0.145 | +0.000 |
| Nov 21 | 0.145 | +0.016 |
| Nov 20 | 0.129 | -0.026 |
| Nov 19 | 0.155 | +0.012 |
| Nov 18 | 0.143 | +0.004 |
| Nov 17 | 0.140 | -0.007 |
| Nov 16 | 0.147 | -0.001 |
| Nov 15 | 0.148 | -0.001 |
| Nov 14 | 0.149 | -0.004 |
| Nov 13 | 0.153 | -0.008 |
| Nov 12 | 0.161 | +0.008 |
| Nov 11 | 0.153 | +0.032 |
| Nov 10 | 0.121 | -0.015 |
| Nov 9 | 0.136 | +0.000 |
| Nov 8 | 0.136 | +0.011 |
| Nov 7 | 0.125 | +0.011 |
| Nov 6 | 0.114 | -0.047 |
| Nov 5 | 0.161 | -0.005 |
| Nov 4 | 0.166 | +0.015 |
| Nov 3 | 0.151 | -0.027 |
| Nov 2 | 0.178 | +0.002 |
| Nov 1 | 0.176 | +0.078 |
| Oct 31 | 0.099 | -0.009 |
| Oct 30 | 0.107 | -0.034 |
| Oct 29 | 0.141 | +0.005 |
| Oct 28 | 0.136 | — |
82 more days on file for this meter, back to August 7, 2026. Full meter-level history is part of Institutional (API and downloads).
Where It Is
Gulf South PipelinePlant location from EIA Form 860 (plant 60926).
Notices
Recent notices on Gulf South Pipeline
Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Gulf South Pipeline notices →
Gulf South Pipeline · posted 2026-11-19 · effective 2026-11-20 · informational
Gulf South Pipeline · posted 2026-11-06 · effective 2026-11-06 · informational
Gulf South Pipeline · posted 2026-10-27 · effective 2026-10-27 · operational alert
Gulf South Pipeline has extended its System Management Plan at Location 24329 Stratton Ridge (to Freeport LNG) for a second consecutive day, effective 10/27/2026 08:00 AM through 10/28/2026 09:00 AM. The SMP is triggered by Freeport LNG's continued failure to take confirmed quant…
Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.
Other Power Generation meters on Gulf South Pipeline
- Montgomery County Power Plant (Entergy Texas Inc.) 0.147 Bcf/d
- Lake Charles Power Station (Entergy Louisiana LLC) 0.144 Bcf/d
- Jack Watson Power Plant @ Gulfport (Mississippi Power Co) 0.139 Bcf/d
- Colorado Bend Plant (State Hwy 60) (CER Colorado Bend Energy Partners LP) 0.129 Bcf/d
- Nine Mile Power Plt (To Lp&L) (Entergy Louisiana LLC) 0.110 Bcf/d
- Rayburn Energy Station (South Texas Electric Coop Inc) 0.095 Bcf/d
- Plant Morrow - Cooperative Energy (Cooperative Energy) 0.090 Bcf/d
- Nextera (Lowman) Choctaw County 0.080 Bcf/d
Cite thisEnercast PipeScrape, St Charles Power Station (Entergy Louisiana LLC) (Gulf South Pipeline loc 24352) scheduled quantity, gas day November 26, 2026. https://enercast.com/meter/gulfsouth/24352/